- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅述高墩柱施工质量控制(Construction quality control of high pier)
浅述高墩柱施工质量控制(Construction quality control of high pier)
Prevention and treatment of surface quality defects of 4 structures
The main cellular, surface voids, bubbles, sand, concrete color inconsistencies, guarantee measures are as follows:
1) the ratio of sand content and water cement ratio should be reduced as much as possible in the design of concrete mix proportion;
2) concrete should be forced mixing, tanker transport, continuous casting, to prevent instability of the slump, the feeder does not converge and the uneven grading of concrete, material segregation caused by the phenomenon;
3) the master vibration test scale, neither the formation of surface vibration sand phenomenon, can not be due to vibration of the honeycomb, pitted under;
4) must be layered pouring, layer thickness can meet the requirements of vibration, in the lower layer before the solidification of the upper layer of pouring, summer due to high temperature, concrete should be doped with appropriate retarder, delay the concrete setting time;
5) try to avoid pouring concrete at high temperature. If it is unavoidable, the steel mould should be cooled down. So in the process of casting steel formwork is hot dry formed ashes should be kept clean.
5 the elimination of formwork joints, layered and sectional construction joints
1) template seam: requires the use of large steel formwork to reduce the seam. The template shall be checked and accepted by the supervisor, and the unqualified ones shall not be used for the project. Double adhesive tape should be applied to the inside seam to prevent surface defects caused by slurry leaking.
2) layered construction traces: most of this phenomenon is due to the slump of concrete, the vibration of cement in the black ingredients floating to the surface, resulting in two layers of dark strip marks. There is also a construction seam mark formed by pouring the upper layer after the primary setting. The solution is to reduce the slump, the first layer must be poured
您可能关注的文档
- 汽车灯具的技术发展(Technical development of automobile lamps).doc
- 汽车玻璃清洗剂配方(Car glass cleaning agent formula).doc
- 汽车电器构造与维修(Construction and maintenance of automotive electrical equipment).doc
- 汽车液压储能再生装置介绍--汽车制动网(Introduction of automobile hydraulic energy storage regeneration device -- automobile brake net).doc
- 汽车电子行业新产品开发项目管理浅谈(Discussion on new product development project management in automotive electronics industry).doc
- 汽车常用的三种助力形式(Three commonly used forms of automobile assistance).doc
- 汽车电控(Automobile electronic control).doc
- 汽车真空度的理解与应用(Understanding and application of automobile vacuum).doc
- 汽车知识1(Automobile knowledge 1).doc
- 汽车磨合期(Automobile running in period).doc
- 浅谈高速公路行业文化的作用(Discussion on the role of expressway industry culture).doc
- 浊音单词(Voiced word).doc
- 济南大学重点必记问题(University of Jinan will focus on the problem).doc
- 浅谈造成漏电断路器频繁误动作的原因(Discussion on the cause of frequent misoperation of leakage circuit breaker).doc
- 济南市高一语文试题(Ji'nan Gao Yi Chinese examination paper).doc
- 济南旅游(Ji'nan Tourism).doc
- 济南春季赏花(Spring flowers in Ji'nan).doc
- 济南水库(Ji'nan reservoir).doc
- 济南暴雨黑色三小时(Ji'nan rainstorm black three hours).doc
- 济南特产(Ji'nan specialty).doc
文档评论(0)