- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
溶洞高压注浆技术交底(High pressure grouting technology test of karst cave)
溶洞高压注浆技术交底(High pressure grouting technology test of karst cave)
Karst High Pressure Grouting Technology for.Txt. One line will estrus of two people, will have a passion three of us are walking together, there will be. It is not cherish. Real girls arent perfect, perfect girls arent real. Take it easy, lose it, go with the flow and fight for it. [technical disclosure]
High pressure grouting of karst cave
Project background: station train station
Disclosure site: pile foundation engineering
Time of issue: December 15, 2009
Disclosure content: cave high pressure grouting
High pressure grouting construction technology of karst cave
Construction flow chart of high pressure grouting construction of karst cave
Construction preparation -- drilling hole cleaning -- water injection test before grouting -- grouting - sealing
I. construction preparation
1, materials
1) the municipal water supply is used for grouting.
2) the cement used for grouting is made of ordinary portland cement, the strength grade of cement is 42.5, and the raw materials are tested. All the indexes of cement are in line with the national standard, and the reports of cement production are given.
2, machinery and equipment
1) the grouting equipment mainly includes drilling machine, grouting pump, mixer, mixer, stopper, screen, grouting pipe and supporting instrument, auxiliary equipment and machine tools, etc..
2) before grouting, check all the grouting equipment status, ensure that the equipment can work properly, reasonable installation of cement shed and mixing station and ancillary facilities.
3, technical preparation
According to the hole number of the pile and the reference geological hole number, the detailed data of karst cave are obtained to determine the slurry concentration, grouting pressure and grouting capacity.
(two) drilling hole cleaning;
Prior to grouting, the core hole shall be cleaned and checked, and the pipe can be lowered under the condition that the hole and the probe stone are not
您可能关注的文档
- 活在美国——吃篇~等你们来了美国就知道多么有用了(Living in the United States - - eat until you come to America to know how useful it is!).doc
- 活动品牌化品牌保鲜剂(Activity Branding brand preservative).doc
- 活性干酵母应用(Application of active dry yeast).doc
- 活性炭在水处理的作用(The role of activated carbon in water treatment).doc
- 活性炭纤维吸附装置(Active carbon fiber adsorption device).doc
- 活法叁寻找你自己的人生王道(Three way looking for your own life.).doc
- 洪涝灾害、泥石流灾害多发疾病中医药防治技术(Flood disaster, debris flow disaster, multiple diseases, Chinese medicine control technology).doc
- 活血化瘀十八法(Eighteen methods of activating blood circulation to dissipate blood stasis).doc
- 活血逐瘀法治疗疑难杂病(Blood Stasis Treatment of difficult diseases).doc
- 活血镇痛胶囊(Huoxue analgesic capsule).doc
- 溶血性黄疸的治疗(Treatment of hemolytic jaundice).doc
- 滋阴壮阳食谱大全(Recipes for nourishing yin and strengthening yang).doc
- 滋阴补肾药酒配方药酒配方大全3(Recipe for nourishing yin and tonifying kidney wine prescription wine 3).doc
- 滋阴润肺秋季家常菜(Nourishing yin and moistening lung in autumn dishes).doc
- 滑动轴承材料(Journal bearing materials).doc
- 滑雪动作要领(Essentials of skiing).doc
- 滕王阁序及翻译(Preface and translation of Pavilion of Prince Teng).doc
- 滕王阁序典故(Preface to Pavilion of Prince Teng).doc
- 滕王阁序中的典故(Allusions in the preface of Pavilion of Prince Teng).doc
- 滕王阁序最新章节目录(The latest catalogue of Pavilion of Prince Teng).doc
文档评论(0)