五、海洋能技术领域(Five. The field of marine energy technology).docVIP

五、海洋能技术领域(Five. The field of marine energy technology).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
五、海洋能技术领域(Five. The field of marine energy technology)

五、海洋能技术领域(Five. The field of marine energy technology) Five. The field of marine energy technology (item 6) 1. marine tidal power generation technology Outcome name Ocean tidal power generation technology Major completion unit Harbin Engineering University Address No. 145, Nantong Avenue, Nangang District, Harbin Postal Code One hundred and fifty thousand and one Technology maturity 01 Laboratory (or sample) 02, pilot 03, pilot 04, forming product 05, others Results have been applied Situation 01, the actual application of 02 technology transfer, 03 large-scale production, 04, not transferred or applied 05 other External demand for implementation of the results transformation 01. Seeking cooperation in the implementation of 02 technology transfer, 03 other ways, 04 no demand Outcome type 01 invention patents 02 new products (or agricultural new varieties) 03, new installations, 04 new materials, 05 new processes (new methods, new models), 06 computer software, 07 technical standards, 08 papers, 09 others Physical size Production Brief The research work of marine tidal energy utilization technology started in 1982 in Harbin Engineering University. After more than 20 years of effort, a team of professionals from ships and marine engineering, fluid mechanics, electrical control and machinery has been formed. In March 2002 and December 2005, Chinas first universal I 70kW float type power flow experimental station and universal II 40kW block tidal power station were built in and respectively. The two power stations are independent power generation systems, which belong to the research test power station and can supply power to a small range. At present, the 150KW class grid connected power flow technology demonstration and demonstration verification system is being developed. The project is currently the worlds largest installed capacity of the floating tidal current power generation prototype demonstration unit, marking the tidal power station system integration design

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档