现浇混凝土及钢筋混凝土模板工程量(The amount of cast-in-place concrete and reinforced concrete formwork).docVIP

现浇混凝土及钢筋混凝土模板工程量(The amount of cast-in-place concrete and reinforced concrete formwork).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
现浇混凝土及钢筋混凝土模板工程量(The amount of cast-in-place concrete and reinforced concrete formwork)

现浇混凝土及钢筋混凝土模板工程量(The amount of cast-in-place concrete and reinforced concrete formwork) It depends on the local quota. Its too much. Here is the Jiangsu 04 meter: 1. The amount of cast-in-place concrete and reinforced concrete formwork shall be calculated according to the following provisions: 1. The amount of cast in place concrete and reinforced concrete formwork shall be calculated in square meters according to the contact area of concrete and formwork. If the contact area of the formwork is calculated with the modulus, the volume of the work is equal to the volume of the member * the modulus of the corresponding item (including the modulus as specified in the appendix). 2, reinforced concrete wall plate, single hole area in 0.3 holes within the rate shall not be deducted, the hole side wall template is not added, but the side wall form prominent wall should be increased accordingly. The single hole area in the hole, outside the 0.3 rate should be deducted, the hole side wall area into the wall, template template engineering quantity calculation. 3, the cast-in-place reinforced concrete frame are respectively calculated according to the column, beam and wall plate, the relevant provisions of the wall engineering calculation of single wall column into the wall, double wall column by column calculation, but the post cast strip, wall engineering amount deducted. 4, equipment bolts, holes or equipment bolts according to different depths to one calculation; two times grouting, according to the actual volume of cubic meters. 5, precast concrete panels or repair cast-in-place joints and crack width in 100mm above, according to the flat quota calculation template. 6. The exposed area of the structure column should be calculated according to the exposed part of the figure (zigzag shape, the width of the template is calculated according to the width of the zigzag surface), the contact surface between the column and the wall is not calculated, and the formwork area is not c

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档