选烧厂制粒-2岗位安全作业标准(Standard Practice for job safety of granulation -2 in selected firing plant).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
选烧厂制粒-2岗位安全作业标准(Standard Practice for job safety of granulation -2 in selected firing plant)
选烧厂制粒-2岗位安全作业标准(Standard Practice for job safety of granulation -2 in selected firing plant)
Standard Practice for job safety of granulation -2 in selected firing plant
1/ to stop the electricity delivery procedures
The person who is responsible for site safety power outage ticket, team leader signed and sent to the duty electrician, electrician on duty, and fill out the actual outage time, workers get the copy after the completion of the blackout;
The operator shall have the power failure ticket to be retained, and when the power failure equipment has no other personnel work, try to start the equipment and confirm the power failure; if there is any work, then do not start the test.
The person who is responsible for site safety power transmission ticket, team leader signed and sent to the duty electrician, electrician on duty, and fill out the actual transmission time, workers get the copy after the transmission completion.
Replace the V-belt
1, equipment malfunction;
2, do not use special tools; 3, turning hand position is wrong not to stand in operation, 4;
1, class leader to determine the safety of the person in charge, must have more than two jobs.;
2, stop, switch the switch to zero, power failure, hang the warning board on the equipment operating box;
3. Inform the operator of the main control room to remove the equipment;
4, the operators cooperate with each other, remove the safety cover, and be directed by the site safety officer, and put it firmly in the place after confirmation;
5, a person holding hands with passive wheel to prevent lateral belt rotation, one hand grasping the triangle belt, a hand holding the belt knife edge toward his hand grasping triangle 100mm from distance, in turn the old belt cut all the homework personnel force should be uniform, other workers from the use of belt knife 1m
6, all the triangle are set on the drive shaft, and then from the outside to the inside of the first installation of triangle belt, the installation should be
您可能关注的文档
- 09非货币性资产交换业务(09 non monetary assets exchange business).doc
- 1-12章名词解释(The 1-12 chapter is the explanation of nouns).doc
- 06 工程费用的监理(06 supervision of project cost).doc
- 1.(4分)如下图中,a~c花盆放在具有一定转速的匀速旋转的转盘上。...(1. (4 points), as shown in the figure below, a~c pots are placed on a rotating turntable with a constant speed. ...).doc
- 1.浙江省土建2010总说明(1. Zhejiang civil engineering 2010 general description).doc
- 100个促销活动方案(100 promotions program).doc
- 100年最震撼心灵的50部英文励志电影(50 most exciting English inspirational films in 100 years).doc
- 100首外国悲伤歌曲(100 foreign sad songs).doc
- 101大厦(101 building).doc
- 105条独居生活小经验!超实用的哦!(105 small experiences of living alone! Super practical!).doc
- 选矿书籍大全(Beneficiation books Daquan).doc
- 逍遥游(Free swimming).doc
- 近代法律全文资料库(Modern legal Full-text Database).doc
- 递延所得税核算法(Deferred income tax accounting method).doc
- 途锐简介(The Touareg.).doc
- 逗女孩子开心的笑话(Funny jokes that make girls happy).doc
- 通俗唱法教程43096(Popular singing tutorial 43096).doc
- 通信工程专业介绍_忧郁红茶(Communication engineering introduction _ Black Tea melancholy).doc
- 通信工程就业方向16571(Communication engineering employment direction 16571).doc
- 通信线路工程复习资料及部分试题(Communication circuit project review materials and part of the examination questions).doc
文档评论(0)