- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电力系统实习日志(Power system practice log)
电力系统实习日志(Power system practice log)
Transformer disassembly and assembly
Todays internship is transformer disassembly and assembly. Through todays practice, we understand the structure of the transformer, to recognize the insulation of substation equipment, insulation, power loss and other aspects of the requirements. A transformer is a device that transforms a class of voltage and current into another voltage and current of the same frequency. The transformer is implemented by magnetic coupling between two windings around the same core. We assemble and disassemble a double winding transformer, which consists of two windings sheathed on the same core. The core is not a single piece of metal, but is a lot like E and a glyph, hand to expose, on the other hand, reduce eddy current, reducing the loss. We are winding through automatic winding machine, the 15 coil coil is about to form 1V voltage, and when the support frame is covered with an insulating line, it begins to bypass the low-voltage winding. At the beginning and at the end, pay attention to tightening the line. Do not cross over while winding. A spacer layer of insulating paper, between the high and low voltage windings to clamp two layers of insulation paper, low-voltage winding coil winding number is less than, their ratio is the ratio, all around after around two layers of insulating paper, winding is completed. Cross the iron core and fit the casing. Through the content of todays internship, I deeply understand the transformer, an important electrical equipment, for the future production practice laid the necessary foundation.
Low-voltage equipment
Todays internship is low voltage equipment. We learned the wiring of the household distribution system. I understand the use of low voltage equipment and its internal structure. Indoor distribution structure is generally for the next line and down line, switch is divided into bipolar and unipolar switches. The bipolar switch controls the on-off of the FireWire a
您可能关注的文档
- 乔布斯与盖茨的恩怨(The grudge between Jobs and Gates).doc
- 争上游,中国资本企业培训启动海外酒庄收购战(Contend for upstream, China capital enterprise training started overseas winery acquisition battle).doc
- 事业单位考试机械类试题(Institutions examination mechanical test questions).doc
- 事业单位岗位设置热点问答(Hot questions and answers for job placement in Institutions).doc
- 于扁平化的渠道下架设厂商新干线(Erect the manufacturer's Shinkansen under the flat channel).doc
- 云南省思茅地区思茅市配货站专用软件(Simao District of Yunnan city in Simao Province special software distribution station).doc
- 云计算技术的应用案例分析(Application case analysis of cloud computing technology).doc
- 五一系列派对之性感红唇主题派对(Red lips theme party at the May Day party).doc
- 五个领域描述幼儿学习与发展美国大学综合(The five area describes infant learning and development in American Universities).doc
- 五大顶级私募在买啥(Five top private equity in what to buy).doc
- 电力术语(Power terminology).doc
- 电力常识(Power common sense).doc
- 电力营销工作总结(Summary of power marketing work).doc
- 电力营销路在脚下(Power marketing the road at the foot).doc
- 电力行业深入解析(Deep analysis of power industry).doc
- 电力电子设计(单相全控桥式-纯电阻负载)(Power electronic design (single phase full control bridge type pure resistive load)).doc
- 电力素材(Power material).doc
- 电力行业的发展(Development of power industry).doc
- 电力知识培训(Power knowledge training).doc
- 电力行业的社会责任相关知识点(Relevant knowledge points of social responsibility in electric power industry).doc
原创力文档


文档评论(0)