油浸式变压器的安装调试方案!(Installation and debugging plan of oil immersed transformer!).docVIP

  • 3
  • 0
  • 约1.55万字
  • 约 13页
  • 2017-10-07 发布于河南
  • 举报

油浸式变压器的安装调试方案!(Installation and debugging plan of oil immersed transformer!).doc

油浸式变压器的安装调试方案!(Installation and debugging plan of oil immersed transformer!)

油浸式变压器的安装调试方案!(Installation and debugging plan of oil immersed transformer!) Installation and debugging plan of oil immersed transformer First, the performance and use of power transformers: 1, step up transformer for the terminal voltage of the generator can be increased to tens of thousands or hundreds of thousands of volts volts to reduce transmission current, reduce energy loss on the transmission line, without increasing the wire section will long-distance power transmission in the past. 2, the step-down transformer is used to reduce the high voltage to the low voltage which is suitable for the use of the power equipment, and the high voltage of the transmission point line is changed into various voltage levels to meet the needs of various power loads. 3: Uses: is to change the AC voltage of electrical equipment. This plan project mainly discusses voltage 10KV, rated capacity 1000KVA, frequency 50HZ, power transformer installation and debugging. Two, the composition and function of power transformer: 1 、 high and low voltage insulation bushing: it is the main insulation device outside the transformer box. It has the main components to connect the fixed lead wire with the external circuit. 2 、 tap changer: change the number of turns of the primary winding, adjust the two voltage, adjust the atmosphere on load and adjust the voltage without load. 3 、 gas relay: it is connected with control circuit to form gas protection device. 4. Explosion proof tube: when the transformer fails, the pressure increases greatly and the pressure is protected. 5, oil pillow: fill oil storage device level transformer, oil standard tube, oil monitoring, oil level, oil hole and the air outlet valve is arranged above the. 6, breathing apparatus: equipped with silicone moisture absorption, silica gel drying under the pale blue, when the tide saturated state, into a light red, then take out, change or high temperature drying can be restored, still protect the original performance. 7 radia

文档评论(0)

1亿VIP精品文档

相关文档