交易转移登记收件(Transaction transfer registration).docVIP

  • 9
  • 0
  • 约1.51万字
  • 约 20页
  • 2017-10-05 发布于河南
  • 举报

交易转移登记收件(Transaction transfer registration).doc

交易转移登记收件(Transaction transfer registration)

交易转移登记收件(Transaction transfer registration) (1) application report (original); (2) land certificate (copy); (3) land transfer contract or transfer decision (copy); (4) confirmation of demolition (copy); (5) supporting documents for the collection of urban infrastructure facilities (original); (6) receipt of air defense work contact list (original); (7) receipt of solid waste handling fees and work contacts (original); (8) five copies of the red line of the nuclear position of the building (original) and electronic documents; (9) construction drawings two sets and three-dimensional renderings of three copies (original); (10) the red line book (original); (11) other requirements. Construction project planning and acceptance 2007-11-29 site I. approval content After the completion of the construction project, the construction unit shall apply to the planning and acceptance window of the urban planning administration of the city for the acceptance of the construction project; in accordance with the conditions for the acceptance of the plan, the construction project shall be issued a certificate of acceptance for the construction project. Two, approval basis 1, Peoples Republic of China urban planning law thirty-eighth; 2. Notice of the general office of the State Council on strengthening and improving the work of urban and rural planning (State Administration Office, [2000]25) third; 3, Wuhan City Planning Ordinance forty-sixth. Three, approval requirements 1, declare essential information (1) application form for construction planning acceptance (original); (2) the completed drawings (original) provided by the qualified surveying and mapping units in conformity with the requirements of the Wuhan unified coordinate system; (3) planning permit for construction projects and their drawings (copies); (4) a set of approved building construction plans (copies, on-site acceptance should be provided with the original); (5) approved planning scheme (copy); (6) approved architect

文档评论(0)

1亿VIP精品文档

相关文档