摘 要
XXX水库除险加固初步设计
XXX水库位于XX市云集乡云丰村,属涪江水系潼江支流本工程存在大坝外坡较陡,有滑坡现象,水库右坝肩及库岸存在渗漏现象,存在放水设施卧管渗漏严重、涵管管身断裂、淤塞等问题,大坝为三类坝。
现溢洪道过洪能力满足规范要求
Abstract
Preliminary design of qinggangpo reservoirs eliminating and reinforcement
Qinggangpo Reservoir is located in Township Jiangyou clouds gathered Feng, Tung River tributaries are Fujiang River. The existence of the dam project outside the steep slope, there are landslides, reservoir exists right abutment and Reservoir leakage, there is a serious leakage of water distribution facilities, horizontal pipe, culvert pipe shaft fracture, blockage and other issues, for the three dam .
Preliminary design of qinggangpo reservoirs eliminating and reinforcement is based on the actual project carrying out the preliminary design. The main elements of design, including review of hydrological design flood, peak flow, as well as review of the flood largest discharge capacity of the spillway ,dam seepage and stability analysis, eliminating and reinforcement design, organized construction design, the engineering budge etc. Hydrological calculation is mainly to work out the flood peak flow of the region for a return period of 20 years and 200 years , than make the calculation for adjusting in accordance with flood peak flow, and calculate the flood level for designing and checking , and finally verify the maximum discharge capacity of the spillway checked by the review is over the spillway Hong ability to meet regulatory requirements. Analysis of the seepage stability of dam is mainly used to determine the phreatic line within the dam and the location of downstream of the spill point, render the dams body and the distribution map of equipotential line within dam foundation, flow network diagram, determine the permeatal gradient of dams earth-filled part ,make seepage analysis compared with the allowing gradient , and the stability analysis is carried out with Sweden circular mean during the stability seepage period . Then management is