- 29
- 0
- 约 50页
- 2017-10-10 发布于河南
- 举报
世界卫生组织室内滞留喷洒技巧标准
喷雾技术 Spray is applied in vertical swaths 75 cm wide. Swaths should overlap by 5 cm. Spray from roof to floor, using a downward motion, to complete one swath. Step sideways and spray upwards from floor to roof. 描向犯隶项琉慨幅舍奠爪执几深由捅忱屡淑镜崔红虫诲蹬此打倘献迄荣读世界卫生组织室内滞留喷洒技术规范世界卫生组织室内滞留喷洒技术规范 To ensure the correct swath width, keep the spray tip about 45 cm from the wall. Lean forwards as you spray from top of the wall and move back as you bring the nozzle downwards. Continue the procedure, moving in a clockwise direction until the room is completed.(Treat the doors and windows firstly when
您可能关注的文档
最近下载
- 高中历史教学中跨学科主题学习的实施策略研究课题报告教学研究课题报告.docx
- 《伟大的卫国战争》解说词全集.doc
- 瓦斯检测与监测专项方案.pdf VIP
- 2025广州一模历史试题+参考答案(word版).docx VIP
- Graph AI:大模型浪潮下的图计算白皮书(2024年).pdf VIP
- 雅马哈HTR-5065_4065使用说明书.pdf VIP
- 2026年济南历下区九年级中考英语一模考试试题(含答案).docx VIP
- 2024届高考政治复习统编版必修4哲学与文化选择题专项练习题(含答案解析).docx VIP
- 《伟大的卫国战争Ⅱ》解说词全十集.doc VIP
- 基于plc控制物流分拣系统.doc
原创力文档

文档评论(0)