- 20
- 0
- 约2.42万字
- 约 8页
- 2017-11-17 发布于湖南
- 举报
桥梁施工工艺方案Method Statement for Bridge
METHOD STATEMENT FOR BRIDGE, MICRO PILING, LOAD TEST AND CONCRETE WORKSCONSTRUCTION METHOD FOR THE BRIDGEOBJECTIVEThe objective of this method statement is to describe and outline a working methodology to ensure a fair degree of control, attention and consideration had been given to the construction of Bridge over Sg. Dapu, Sarawak.SCOPE OF WORKThe scope of work will cover the work methodology for:o Site Preparation o Pilling Work (Bored Pile)o Testing of Piles (PDA, Load Test and Pile Integrity Test*) o Construction of Foundation o Construction of Abutment o Construction of Pier o Constructio
原创力文档

文档评论(0)