METHOD STATEMENT FOR BRIDGE, MICRO PILING, LOAD TEST AND CONCRETE WORKSCONSTRUCTION METHOD FOR THE BRIDGEOBJECTIVEThe objective of this method statement is to describe and outline a working methodology to ensure a fair degree of control, attention and consideration had been given to the construction of Bridge over Sg. Dapu, Sarawak.SCOPE OF WORKThe scope of work will cover the work methodology for:o Site Preparation o Pilling Work (Bored Pile)o Testing of Piles (PDA, Load Test and Pile Integrity Test*) o Construction of Foundation o Construction of Abutment o Construction of Pier o Constructio