- 2
- 0
- 约1.69万字
- 约 5页
- 2018-08-18 发布于天津
- 举报
人工土层快滤系统主要设计参数优化研究-生态学杂志
Chinese Journal of Ecology 2005,24( 8) : 930~ 934
*
去除COD 的参数优化
1, 2, 3 1* * 1 1 1 1
郭 伟 李培军 台培东 尹 炜 李海波 许华夏
1 2 3
( 中国科学院沈阳应用生态研究所, 沈阳110015; 中国科学院研究生院, 北京 100085; 沈阳农业大学农学院,
沈阳 110161)
, COD
, ( / ) ( )
COD , , COD
/ = 1073, = 4 h,
= 1/ 8, COD 84. 73% ,
,
, COD,
X505 A 1000- 4890( 2005) 08- 0930- 05
Optimization of main designed parameters of artificial rapid infiltration land treatment system- COD re
1, 2, 3 1 1 1 1 1 1
moval. GUO Wei , I Peijun , TAI Peidong , YIN Wei , I Haibo , XU Huaxia ( I nstitute of Ap p lied
Ecology , Chinese A cademy of Sciences , Shenyang 110015, China; 2 Gr aduated School of Chinese A cademy of
Sciences, Beij ing 100085, China; 3 College of A g ronomy , Sheny ang Ag r icultur al University , Shenyang
110161, China . Chinese Jour nal of Ecology , 2005,24( 8) : 930~ 934.
In t his paper,t he Art ificial Rapid Infiltrat ion System ( ARI) was simulated under laboratory condit ions, and
t he main designed parameters including the component of art ificial soil ( quartzite/ soil) and running circle
( flooding time and flooding time/ drying time) for the highest removal rate of COD were optimized. The sta
ble removal rate of COD was obtainedby the reciprocal equation method, and the model of multi linear regres
sion equat ion w as established by stepw ise regressive method. The optimizing parameters of ARI w ere x 1
( quartzite/ soil) = 1.073, x (flooding time) = 4 h, and x (flooding ti
您可能关注的文档
最近下载
- 心理治疗师考试复习重点笔记汇总名师资料.docx VIP
- 心理治疗师考试复习重点笔记汇总.pdf VIP
- 2024年卫生资格(中初级)-心理治疗(师)历年考题高频考点荟萃带答案.docx VIP
- 心理治疗师考试复习重点笔记汇总.doc VIP
- 09G901-5混凝土结构施工钢筋排布规则与构造详图(现浇混凝土板式楼梯)(OCR).pdf VIP
- 建筑工程图集 09G901-3:混凝土结构施工钢筋排布规则与构造详图(筏形基础、箱形基础、地下室结构、独立基础、条形基础、桩基承台).pdf VIP
- 03G101-2:混凝土结构施工图平面整体表示方法制图规则和构造详图(现浇混凝土板式楼梯) conv.docx VIP
- 公路改性沥青路面施工技术规范标准.pdf VIP
- 孙存周--入室弟子张烈先生论形意拳练法.pdf VIP
- 无机化学习题张祖德习题答案.pdf
原创力文档

文档评论(0)