主机遥控数据和试验程序Chief C20 TEST PROCEDURE.doc

主机遥控数据和试验程序Chief C20 TEST PROCEDURE.doc

  1. 1、本文档共44页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
主机遥控数据和试验程序Chief C20 TEST PROCEDURE

DataChief C20 FT / FAT Procedure KG8/KG9 Department/Author: Approved by: Operations/Bente Lise Mel?s (s) Bj?rn Marthinsen (s) 2001 KMSS AS Ship Automation All rights reserved No part of this work covered by the copyright hereon may be reproduced or otherwise copied without prior permission from KMSS AS Ship Automation DOCUMENT STATUS Issue No. Date/Year Inc. by Issue No. Date/Year Inc. by A 10-Jun-99 ASJ B 1-Jul-99 ASJ C 1-Jul-99 ASJ D 1-Apr-01 ?E/BLM CHANGES IN DOCUMENT Issue ECO Paragraph Paragraph Heading/ No. No. No. Description of Change A First issue. B AOE-005210 The document has been updated according to new functions. C AOE-005216 Updated on request from classification society. D AOE-006905 LOS added to the procedure. Year 2000 test removed. General corrections TABLE OF CONTENTS Section Page 1. Introduction 1 2. General test 2 2.1 Mains Power Failure 2 2.2 Date Change in Application 2 3. Functional Test of the OCP 3 3.1 Test Purpose and Preparation 3 3.2 Lamp Test / Alarm Test 4 3.3 Mimic Display 5 4. Test of Alarm System 6 4.1 Test of On/Off Alarm-Channels 6 4.2 Test of Analogue Alarms and Acknowledge 8 4.3 Alarm-Limit/ Time Delay Change 9 4.4 Test of Alarms with Inhibit Function 10 4.5 Test of Combined Alarm and Log Printer 11 5. Test of Responsibility Transfer and Watch calling System 12 5.1.1 Watch Responsibility Transfer from ECR to Bridge. 12 5.2 Alarms 13 5.2.1 Acknowledge 13 5.2.2 Repeat Alarm 14 5.3 Call Duty Engineer 17 5.4 Watch Call During ROS Failure 18 6. Test Of Graphical User Interface 19 7. Test Of Limited Operator Access And Override 21 7.1 Alarm Acknowledge from the ROS on the Bridge or CCR 21 8. Test Of System Failures 22 8.1 Test of Communication Failures 22 8.1.1 Communication Failures on the CAN Bus 22 8.1.2 Communication Failures in Redundant CAN Bus 23 8.1.3 OCP Communi

文档评论(0)

skvdnd51 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档