- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建设工程中英互译
Construction Engineering Construction Quality Management and Control
【Abstract】This article from the quality assurance system, the construction preparation stage, construction stage, the stage of completion and acceptance of quality management and control of the construction described, in order to control the construction quality of housing projects provide a reference.
【Key words】Housing building; Construction; Quality; Control; Discussion. 1. Foreword
As housing construction products, construction works, due to long duration, large investment, construction sites is fixed, open-air operation by the external environment affecting the construction process complex factors affecting the quality and more difficult to control the construction quality. The quality of construction quality of housing construction and closely related to peoples production and life, after completion of the project put into use if it is safe and reliable, the relationship between the state and peoples lives and property, the construction stage is the formation of the key to the quality of construction products, so the construction Quality management and control is essential. Housing construction project quality management and control is a systematic project, from feasibility studies, survey and design, construction, completion and acceptance phases, there is quality management and control issues. The construction phase of quality management and control of the Housing projects were the core of the whole process of quality control, quality management and control of the construction phase effectiveness of the means is related to the final quality of the whole project can meet the state standards and the project owners investment requirements, decided to build use of the product functionality, service life and economic benefits.
2. The establishment of project quality management leadership, establish and improve the quality of construction quality assurance system is a prerequisite for mana
您可能关注的文档
- 机械检查标准(附件一).doc
- 广西百色市平果县2016年中考英语模拟试卷.doc
- 小学英语常用词组大全.docx
- 第一部分 写作高分策略.doc
- 幼儿园一日生活常用英语.doc
- 中国企业绩效管理问题总结及应对(英文).docx
- 译林版6A unit1-2.docx
- 土豆报告(正式).doc
- 高考英语非谓语经典辨析题.doc
- 2010海淀英语.doc
- 【ISO 操稳法规_2005年欧盟EVSC会议上的调研报告】.doc
- 09-10学年仁爱版英语九上Unit2单元考试卷.doc
- JOIN IN四年级下册词汇.doc
- 内蒙古乌海市第二十二中学八年级英语上册 Unit 1 Topic 1 I’m going to play basketball Section B教案.doc
- 新目标英语八年级上UNIT 10 I’m going to be a basketball player—period A(1a 1b 1c)教案2.doc
- 201512020302 建筑翻译.doc
- 苏教版7A期中测试题.doc
- WTO案例9英文.docx
- 西南大学大学英语346级语法教程习题.doc
- 阅读理解与七选五.doc
文档评论(0)