超高压喷射灌浆工法(SJM)之应用-以捷运芦洲线徐汇中学-台北市政府.PDFVIP

超高压喷射灌浆工法(SJM)之应用-以捷运芦洲线徐汇中学-台北市政府.PDF

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
超高压喷射灌浆工法(SJM)之应用-以捷运芦洲线徐汇中学-台北市政府.PDF

41 67 捷運技術半年刊 第 期 超高壓噴射灌漿工法(SJM)之應用 -以捷運蘆洲線徐匯中學站施工為例 1 2 摘 要 CL700B CL802 949 8 Superj et-Midi(SJM) Superj et-Midi Application of Superjet-Midi (SJM) Grouting Method–Taking the Luzhou Line’s St. Ignatius High School Station as an Example 1 2 Hua-Kang Teng Heng-Tzu Lin Abstract In a geological survey during construction, the Luzhou line’s St. Ignatius High School Station (Section Contract CL700B) was found to have complex soil layers with a tendency towards floating and being disturbed. In addition, on the diaphragm wall appeared multiple continuous bends. As a result, all those factors have contributed to difficulties during construction of the station. Although necessary consideration and operations about the potential risks were conducted prior to deep excavation, an accident occurred on Sept. 8, 2005 that could still have been effectively avoided. Taking the accident at the Luzhou line’s St. Ignatius High School Station as an example, this paper introduces related follow-up remedial measures and reviews the application of the Superjet-Midi (SJM) grouting method to the construction site returning to its original condition, and serving as a reference for later station excavation. Keywords: Superjet-Midi (SJM), grouting, excavation, Luzhou Line, St. Ignatius High School Station 1x8048263@.tw 2htlin@.tw 68 鄧華岡 林恆次 超高壓噴射灌漿工法(SJM)之應用 -以捷運蘆洲線徐匯中學站施工為例 一、前言 CL802

文档评论(0)

wendang_12 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档