- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
系泊试验-英文
1 TEST OF ANCHOR EQUIPMENT AND WINDLASS 3
2 TEST OF STEERING GEAR 4
3 TEST OF LIFESAVING EQUIPMENT 6
4 TEST OF MOORING WINCH AND TOWING EQUIPMENT 8
5 TEST OF DECK CRANE 10
6 TEST OF BOLLARD PULL 12
7 TEST OF DOOR, WINDOW AND HACTH COVER 13
8 TEST OF SIGNAL EQUIPMENT 13
9 TEST OF FIRE-FIGHTING EQUIPMENT 14
10. Hydraulic sliding watertight door 14
1 TESTS OF ANCHOR EQUIPMENT AND WINDLASS
1.1 Check the installation correctness and integrality of windlass, hydraulic power pack, anchor chain, anchor and chain stopper etc. Check the certificates of windlass, anchor chain and other anchor products before installation.
1.2 Check the hydraulic piling’s installation and cleaning before testing. And make sure the cable’s connection is correct.
1.3 All electric equipments will be checking their insulations before and after testing.
1.4 The hydraulic pump running for 5 min without load. Then check the working condition of every alarm point and the working pressure of relief valve and overflow valve.
1.5 Run the hydraulic windlass without any load for totally 60min of ahead and astern at full speed continuously. Vary once in every 3~4 minutes of ahead and astern. Mooring drum and head drum each clutch once. The valves of hydraulic motor, hydraulic pump and hydraulic oil system should run normally in the process of the test. The whole system and every moving part should have no phenomena of oil spill, unwonted radiation and beating. Measure and record the oil pumps working pressure, the speed of oil pump and oil motor, and the temperature of the bearings. Measure and record the electric motor start current, working current, voltage, insulation resistance and rev.
1.6 Throw the anchors separately. Brake 2~3 times with braking device at the same time, then hoist the anchors. The follow contents to be check at this moment:
(1) Check the convenience of clutch and the dependability of the braking device.
(2) The situation of anchor chain and shackle go through the hawse pipe, chain
您可能关注的文档
- 特斯拉豪赌中国市场(英汉).doc
- 九年级英语全册+Chapter+2+Care+for+hair单元综合测试题+牛津深圳版(含答案).doc
- 2013年高考英语试卷及答案---北京卷(word版).doc
- 奥运比赛常用短语.doc
- 郑大化学系第一学期期末试题A.doc
- 天津南开中学高一英语语法专向练习及答案.doc
- 江西省南昌市2015-2016学年高二英语下册第一次月考试题.doc
- 青少版新概念英语1A期中试题.doc
- NATTI翻译道德准则.doc
- Halcon80_图像采集接口程序员手册.doc
- 2023年江苏省镇江市润州区中考生物二模试卷+答案解析.pdf
- 2023年江苏省徐州市邳州市运河中学中考生物二模试卷+答案解析.pdf
- 2023年江苏省苏州市吴中区中考冲刺数学模拟预测卷+答案解析.pdf
- 2023年江苏省南通市崇川区田家炳中学中考数学四模试卷+答案解析.pdf
- 2023年江西省吉安市中考物理模拟试卷(一)+答案解析.pdf
- 2023年江苏省泰州市海陵区九年级(下)中考三模数学试卷+答案解析.pdf
- 2023年江苏省苏州市高新二中中考数学二模试卷+答案解析.pdf
- 2023年江苏省南通市九年级数学中考复习模拟卷+答案解析.pdf
- 2023年江苏省南通市海安市九年级数学模拟卷+答案解析.pdf
- 2023年江苏省泰州市靖江外国语学校中考数学一调试卷+答案解析.pdf
文档评论(0)