1950RT低温冰机技术规范.docx

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
1950RT低温冰机技术规范

CENTRIFUGAL WATER CHILLERSPART 1 – GENERALWORK INCLUDEDThis Section specifies the requirements necessary to furnish and install the water-cooled centrifugal liquid chillers, including start-upand commissioning, complete, with all necessary control and starting equipment.The water-cooled liquid chillers are intended for use in conventional chilled water air conditioning heating system.Electrical component design and selection shall be based upon 6,600volt electricalpower supply.Equipment includesChiller package.Charge of refrigerant and oil. Connections of chilled water piping andcondensate water pipingControls.Starters.Electrical power connections from starter to control panel.Vibration IsolationEquipment installation, start-up, commissioning and maintenance.ReferencesANSI/ASHRAE 15-Safety Code for MechanicalRefrigeration.ANSI/ASHRAE 90-Energy Conservation in NewBuilding Design.ANSI/ASME SEC 8-Boiler and Pressure Vessel Code.ANSI/ASME B31.5 -Refrigeration Piping.ANSI/UL 465-Central Cooling Air Conditioners.ARI 550-Centrifugal or Rotary Water Chilling Packages.QUALITY ASSURANCEThe entire unit, with all components, shall be UL labeled and bear the respective labeland comply with P.R. China standards.Factory test chiller performance and certify in accordance with ARI 550-92. All factory tests shall be witnessed by the Owner or designated representatives as required. Minimum run-in test shall be 4 hours continuous on the test pad and maintain LWT at plus or minus 0.28 degree C (0.5 degree F) tolerance. Submit separate price breakdown for factory performance test of only one machine, or for testing all machines in initial purchase.The Owner shall be notified at least one month in advance of the test and shall be allowed to witness all run-in tests on the equipment destined for this project.The construction of chiller components and assemblies which come in contact withchilled water and condenser water shall be compatible with the water treatmentpackage used to inhibit c

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档