- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
21regularity规律
Draw up to start construction diagram budget behind, after examining, fix total price to wrap stem.
The some construction unit checked against to start construction diagram to hard recheck to invite bids detailed list, discovered that underground garage fire fight water within engineering sprays amount of engineering to be partial to
Is low, but residence the indoor lamp install probably in the process of starting construction in change cancel, hence while quoting press is higher than price 20% lists in market
The price makes sure water sprays a comprehensive unit price and press is lower than 20% unit prices of price in the markets the assurance residence lamp comprehensive unit price.In its offer in addition to the cent is part of
Item engineering fee 18,000,000 dollars outside, also have the environmental protection fee 50,000 dollars, the facilities fee is 800,000 dollars at the time, the nighttime construction increases fee 300,000 dollars,
Winter rain expects to start construction to increase fee 250,000 dollars, the scaffold fee is 160,000 dollars, the engineering lines up a dirty fee 50,000 dollars, five insurance one gold is 900,000 dollars, tax gold 320
10000 dollars and tender document stipulates to account to go into of other expenseses.
Two, analysis and reference answer
1.be engaged in the unit of elevator gearing should have what condition?
According to 《special kind equipments the safety inspect regulation 》 , the elevator belongs to involve a life safety, risk bigger equipments.
The unit that installs elevator should obtain the special kind equipments(elevator) gearing permission certificate,
Install mutually accommodative professional technical personnel and technique with elevator worker,
Install mutually accommodative examination means with elevator,
There are sound quality management system and responsibility system.
2.draw up to start construction diagram budget to have which ways?
Drawing up to start construction diagram budget can adopt the l
您可能关注的文档
最近下载
- invoee英沃 VC610系列数控机床专用变频器使用说明书.pdf VIP
- 图形化一级全真模拟题.docx VIP
- 政教处主任职责及学生心理健康工作.docx VIP
- 全国青少年软件编程(python)等级考试模拟卷7(一级).docx VIP
- 5.2 珍惜师生情谊 课件-2024-2025学年统编版道德与法治七年级上册.pptx VIP
- 实用教程一级U4过去将来时.docx VIP
- 广东省家庭医生式签约服务团队.doc VIP
- 青少年软件编程(Python)等级考试试卷(一级).39.docx VIP
- WIN7操作系统练习题题库版.docx VIP
- 初中解一元二次方程计算练习.docx VIP
文档评论(0)