FA Report FormatRev F English—ppap文件.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
FA Report FormatRev F English—ppap文件

FROM: Vendor Number: Report Prepared by: Title: TO: CSI Attention: CSI SKU P/N.: Rev. Supplier P/N: Rev. Product Description: Metal Plating: Quantity of Samples: Organic Coating: Components per unit Times of Submission: Project Name: Date of Submission: Reason for FA Report Description Reason for FA Report Description A) New Supplier E) Mat. Source Change B) New Product F) Design Change C) Process Change G) Tooling Change D) Corrective Actions H) Others FA Results Summary Inspection Items Supplier CSI Remark Accepted Rejected Accepted Rejected 1) Dimension (see note) 2) Fit Function 3) Finishes Color 4) ES 160-performance 5) Reliability Note: All drawing dimensions for all parts and finished assembly shall be measured for Reason A and B. Min. 5 measurements for each cavity shall be reported for major critical dimensions; Min. 2 measurements for each cavity shall be recorded for non-critical dimensions and reported upon request by CSI. FA is ACCEPTED FA is REJECTED Because: FA CONDITIONALLY ACCEPTED Conditions: Approved by Signature Date Remark 1) Supplier Representative 2) CSI Asia Quality 3) CSI Asia Project 4) CSI Quality Manager 5) CSI Project Manager Attachment-1Dimensional Results for P/N: (Use attachment for each individual P/N. Drawing must be included with the attachment) Cavity No. Total Cavities: Inspected by: No. Zone Drawing Spec. Measurement Records (Min. 5 parts) Conclusion Ac Re Comments 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) Note: If there is a dimension rejection, either the supplier’s tooling/process or CSI drawing shall be modified (per supplier’s suggestion). CSI Project Manager shall make a note on this report if the change request is approved. Cavity No. Tot

文档评论(0)

xjj2017 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档