1989 Progress with the Excavation and Support of the Mingtan Power Cavern Roof英文文献.pdf

1989 Progress with the Excavation and Support of the Mingtan Power Cavern Roof英文文献.pdf

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Progress with the excavation and support of the Mingtan power cavern roof D. Moy, Golder Associates, (UK) Ltd. E. Hoek, University of Toronto Originally published as: Moy, D. and Hoek, E. 1989. Progress with the excavation and support of the Mingtan power cavern roof. Proc. Rock Cavern Seminar - Hong Kong (eds A.W. Malone and P.G.D. Whiteside), pp. 235-245. London: Institution Mining and Metallurgy. Excavation and support of the Mingtan power cavern roof Abstract This paper gives summary details of the geological conditions and support design adopted for the roof of the Mingtan power cavern in Taiwan. The presence of 35 degree dipping faults in the roof and hunches of the cavern led to the adoption of pre- reinforcement of the roof and pre-treatment of the faults in advance of general cavern excavation. The response of the roof to excavation is described as revealed by visual observation and instrumental data, and summary details are given of computer modelling carried out to back analyse the behaviour of the roof. Introduction The 1600 MW Mingtan Pumped Storage Project is currently under construction in central Taiwan. The scheme is being constructed for the Taiwan Power Company by RSEA, which is the largest publicly owned construction company in Taiwan. It will be Taipei’s second pumped storage project, following the commissioning of the 1000 MW Minghu project in 1985. Detailed design of both these schemes was carried out by Sinotech Engineering Consultants on behalf of Taipower. Golder Associates have provided assistance to Sinotech with rock engineering aspects of the design and construction of the Mingtan project. The

文档评论(0)

网游加速器 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档