- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土建材料采购合同模板s
Supply Contract Contract No:xxx Project-00001Date:DD-MM-YYThe Buyer:SINOHYDRO XXX PROJECT, QATAR ( Hereinafter referred to as the Buyer” )Add:XXX Doha, Qatar. P.O.BOX:23928Contact:Mr. XXX Mr. XXXTel:+974-XXX Fax:+974-XXX Mobile:+974-XXX / E-mail:XXXThe Seller:XXX. ( Hereinafter referred to as the “Seller” )Add:P.O.BOX:50207, Mesaieed, Qatar.Contact:Mr.XXXTel:+974-xxx Fax:+974-xxx Mobile:+974-xxxE-mail:xxxThe contract is made by and between the buyer and the seller, whereby the buyer agrees to buy and the seller agrees to sell XXX in accordance with the terms and conditions stipulated below:Products / Quantity / Specifications / PriceAs per the Attachment I “ The Contracted Products / Materials List ”The total contract amount is QRXXX , namely, Qatari Riyal XXX. The amount shall include all kinds of taxes, customs duty, loading charge, transportation charge to Lusail jobsite etc.Country of Original and ManufacturesManufacturer:xxx.Origin:xxx(country).Packing and TransportPacking:To be packed solidly suitable for long distance transportation, multi-handing and well protected against dampness, shock, rust etc. The Seller shall be liable for any rust, damage and loss attributable to inadequate packing by the Seller.Transport:The Seller shall transport all contract materials to the site area designated by the Buyer. And the Buyer shall be responsible for unloading.Time and deliveryThe Seller shall deliver all items in the attached products / materials list to the buyer’s project site within XX days after the date the contract come into force.Technical SpecificationsAll Materials shall comply with the Specification of Attachment II.Terms of PaymentThe buyer shall issue one cheque amounting XX of the contract amount in favor of the Seller as advance payment with XXworking days after this contract coming into force. The remained XX shall be paid to the Seller in 30 days against delivery note signing by Chinese engineers at site.RequirementsThe seller shall present the fol
您可能关注的文档
最近下载
- NB_T35106-2017 国家行业标准.pdf VIP
- 建设项目海绵设施施工验收标准.pdf VIP
- 2024-2025学年小学信息科技湘教版2024五年级上册-湘教版(2024)教学设计合集.docx
- 热控专业简介(基础系统介绍)(精品课件).ppt VIP
- 2025湘美版美术八年级上册第一单元第1课《假期视觉笔记》课件.pptx
- 2025-2030中国相容剂行业市场发展分析及前景趋势与投资机会研究报告.docx
- TSG 11-2020 锅炉安全技术监察规程.docx VIP
- 2023-2024年版中国运动康复产业白皮书.pdf
- 小学生抽屉整理课件.pptx VIP
- 打字员速录技能培训课件.pptx VIP
文档评论(0)