- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高中英语Module6 Section Ⅰ Ⅰntroduction & Reading pre reading课件 外研版必修3()
【创新方案】高中英语Module6 Section Ⅰ Ⅰntroduction & Reading pre reading课件 外研版必修3
Module 6
Step 1 Step 2 Step 3 Step 4 Step 51.Could you tell us some historical sites? Which one have
you visited?
2.Is it dangerous when water rose to the imum level at
China‘s Three Gorges DamWater rose to the imum 最高的 level at Chinas
Three Gorges Dam, driving electricity output to full
capacity 生产量 at the worlds largest hydropower plant
for the first time since it began operating The dam is a $ 23 billion project on the upper
reaches of China‘s longest river, the Yangtze River. It was
built to end centuries of floods and to provide energy to
fuel the country’s economic growthConstruction of the 410-mile -long660-kilometer-long
reservoir began in 1993 and it began storing water in 2003 Its water level hit its peak height of 175 meters at 9 am
on Tuesday, according to project operator, the China Three
Gorges Project Corp. The previous record was 172.8 meters
567 feet set in 2008, the year when the generators began
operatingCompany chairman Cao Guangjing called it a “historic
milestone”. He said annual powergeneration would reach 84.7
billion kilowatt hours, which would enable the project to
realize its function of power generation to the full To reach that level, dam officials had begun holding back
water in September. The water level will be kept at the
current height for about two months and then be allowed to
drop. In the future, the water level will be kept between 145
meters 476 feet and 175 meters 574 feet, depending on
flood control needsBut that could carry risks. Last year, a Chinese
magazine C ai j i n g mentioned a government report that
warned that rising water levels were increasing landslide
risks as the soil around the dam became more unsettledBut expert Yan Echuan, part of an expert team hired by
the government to assess 评估 geological risks of the
project, said he didn‘t believe that keeping the water at the
imum le
您可能关注的文档
- 逸新空气净化器市场营销策划书.ppt
- 遥感与地理信息系统 - 遥感数字图像处理方法- 广州大学.ppt
- 邮政公司年终总结汇报材料.ppt
- 配合饲料加工工艺完整版_机械仪表_工程科技_专业资料.ppt
- 配合饲料加工工艺完整版_.ppt
- 郑益生--新时期办公室领导艺术.ppt
- 重复压裂技术在江汉低渗透油田的应用.ppt
- 重庆东风日产汽车南方闭馆.ppt
- 重庆大渡口区游戏代理副区长完颜顾绯:网络游戏分区运营PPT 游戏蜗牛分区运营计划书.ppt
- 重庆盛和塾2012稻盛和夫重庆报告会最终赞助方案 (NXPOWERLITE).ppt
- 2025年无人机低空医疗物资投放社会效益报告.docx
- 2025年再生塑料行业包装回收利用产业链重构研究.docx
- 《AI眼镜周边产品市场机遇:2025年终端销售与需求增长洞察》.docx
- 2025年坚果加工行业深加工技术突破与市场拓展策略报告.docx
- 2025年通信芯片行业技术竞争与未来趋势报告.docx
- 《2025年生鲜电商配送冷链事故分析与预防措施》.docx
- 《商业航天融资新趋势2025民营卫星企业资本涌入估值分析市场动态》.docx
- 2025年能源绿色健康行业创新技术与市场应用报告.docx
- 2025年无人机低空医疗救援通信方案分析报告.docx
- 2025年烹饪机器人行业市场集中度分析报告.docx
原创力文档


文档评论(0)