INDUSTRIALENGINEERINGMANUAL工业工程手册详细内容.doc

INDUSTRIALENGINEERINGMANUAL工业工程手册详细内容.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
INDUSTRIAL ENGINEERING MANUAL INDEX Section 1 The Toy Blue Book A. Blue Book Contents B. Blue Book Procedure C. Blue Book Audit Check Sheet Section 2 Development of a Standard A. Development Cycle B. Principles of Motion Economy C. Predetermined Methods-Time Data D. Time Study Section 3 P.M. II A. P.M. II Data B. P.M. II Analysis Sheet Section 4 Direct Labor Standard Data A. Carton Pack Out Barbie Packaging P.O. B. Shrink Wrap C. Hot Melt Carton Sealing D. Painting E. Poly Bagging Section 5 Labor Distribution A. Line Tooling and Labor Distribution Sheet B. Methods Indices Guidelines C. How to Balance an Assembly Line Section 6 The Flow Chart A. Flow Chart Procedure B. Part Numbering System C. Time Factors D. Standard Allowance Build Up E. Standards Change Notice F. Flow Chart Processing Section 7 Packaging A. Packaging Specification Procedure B. Packaging - How Not To and How To C. Kraft Containers D. Corrugated Specifications Section 8 Finished Goods A. Pallet Pattern Selection Section 9 Station Design A. Hopper and Bin Design B. Station Check List C. Changeover Hoppers D. Standard Stations Section 10 Line Layout A. Line Layout Procedure B. Check List Section 11 Rework and Salvage A. Rework and Salvage Procedure Section 12 O.S.H.A A. Maximum Opening for Fixed Barrier Guards B. ARO Two Hand Logic C. Safety device Notice D. Production Chemicals E. Dip Nest Design Section 13 New Toys A. New Toy Development B. Manufacturing Concept Presentation C. Final Engineering Pilot D. Production Pilot E. Procedure for Handling F.E.P. Parts F. New Toy Check List G. I.E. Audit and Performance Evaluation Section 14 Budgets A. Line Tooling Budget B. Cost Sheets C. Spare Parts D. Capital Expenditures Section 15 Work Orders A. Work Order Procedure B. Tool Crib Requisition C. Intercompany Work Authorization Section 16 Miscellaneous Procedures A. Warranty Control

文档评论(0)

大吧书屋 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档