网站大量收购独家精品文档,联系QQ:2885784924

淮南可持续发展工程采煤塌陷区综合治理世界银行贷款项目.doc

淮南可持续发展工程采煤塌陷区综合治理世界银行贷款项目.doc

  1. 1、本文档共19页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
淮南可持续发展工程采煤塌陷区综合治理世界银行贷款项目

CHINA: Huainan Coal Mining Subsidence Area Rehabilitation Project Social Assessment Report Summary Project Management Office of Huainan Municipality October, 2014 1 Brief Project Description 1. In order to control and rehabilitate the area with ground subsidence and environmental degradation caused by long-term coal mining, and to promote sustainable development, Huai’nan municipal government proposed the “World Bank (WB) Financed Huainan Mining Area Rehabilitation Project (hereinafter referred to as Huai’nan WB Project).” 2. The Huai’nan WB Project is located in the Jiulonggang-Datong (or JiuDa) coal mining subsidence area of Datong District, Huai’nan City, Anhui Province, covering the area of 9.3 km2, and comprising 3 subprojects, respectively: (1) Environmental remediation and water system treatment; (2) infrastructure improvement and development and utilization of the project area; (3) project management and technical assistance. Please refer to Table 1 for content introductions in detail. Table 1. Project Profiles Subproject Name Construction Content Objective 1. Environmental Remediation and Water System Treatment 1) Environmental remediation: environmental remediation of the mining wasteland and re-vegetation of the project area 1) Halt the further deterioration of ecological environment, make every effort to restore the complete plant community system, biologic chain system and the local nature ecosystem within the region; 2) Create the landscape elements such as nursery and forest into an integrated green space of leisure, recreation, fitness and science demonstration through integration and improvement of the greenway to promote the blending development of the old and now urban areas. 2) Water system treatment: repair the water system in the project area and meet the 30-year return anti-external flash flood and 30-year return drainage requirements Reaching the 30-year return anti-external flash flood and 30-year return drainage requirements though

文档评论(0)

zhaoxiaoj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档