- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
设施规划校区布局规划
课程设计
论文题目 山东工商学院东校区布局规划 院系班级 管理科学与工程学院
目录
摘要······················································2
山东工商学院简介·······································4
学校现在布局存在的问题·································3
资料收集···············································6
学校区域间相互关系分析·································6
作业单位位置相互关图··································10
教学区内部规划········································14
7、停车场位置············································16
8教职公寓区············································ 18
9、整个东校区布局图······································18
10、总结·················································19
11、参考文献············································19
摘要:系统布置设计SLP法将研究设施布置问题的依据和切入点归纳为P—产品、Q—产量、R—工艺过程、S—辅助部门、T—时间5个基本要素。采用SLP法进行企业总平面布置的首要工作是对各作业单位之间的相互关系做出分析,包括物流和非物流的相互关系,经过综合得到作业单位相互关系表。然后,根据相互关系表中作业单位之问相互关系的密切程度,决定各作业单位之间距离的远近,安排各作业单位的位置,绘制作业单位位置相关图。将各作业单位实际占地面积与作业单位位置相关图结合起来,形成作业单位面积相关图。通过作业单位面积相关图的修正和调整,得到数个可行的布置方案,然后采用加权因素对各方案进行评价择优,并对每个因素进行量化,以得分最多的布置方案作为最佳布置方案。
关键词:系统布置设计SLP 相互关系 相关图
Abstract:SLP system layout design method based research facility layout problem and entry summarized as P-products, Q-yield, R-process, S-secondary sector, T-time five basic elements.SLP method using the general layout of corporate priority is to make an analysis of the relationship between the various operating units, including the relationship between logistics and non-logistics operations units obtained through comprehensive relationship between tables.Then, based on the closeness of the relationship between the units operating table asked mutual relations, decided to distance the distance between the operating units, positions each operating unit, the operating unit position to draw a correlation diagram.The actual area of ??each operating unit and the operating unit position correlation diagram combine to form the operating unit area associated map.Through amendments and adjustments related to operating unit area map, get s
您可能关注的文档
- 计算机专业数据捆绑技术.docx
- 计算机专业公司VI系统设计.doc
- 计算机专业毕业论文外文翻译0.docx
- 计算机专业毕业论文提高校园网教育资源有效利用率的研究.doc
- 计算机专业毕业设计GIS软件和数据结构.docx
- 计算机专业毕业设计 JSP的技术发展历史.doc
- 计算机专业毕业论文手机网站制作.doc
- 计算机专业毕业设计外文文献翻译部分.doc
- 计算机专业毕业设计组策略的概述.doc
- 计算机专业的社会需求数据分析开题报告.doc
- 三一重工:2024年可持续发展(ESG)报告.pdf
- 绿色保险(十九)聚焦铅酸蓄电池行业上市公司环责险信息披露的破与立.pdf
- 3种公私联动打法撬动新流量机会.pdf
- 【戴德梁行】2025年全球物流与工业地产市场动态报告.docx
- 房地产市场报告 -2025年5月全国租赁市场月报.pdf
- 宏全基因组测序结题报告.pdf
- 【1628东察创新】McKinsey未来竞争的主战场解读报告.docx
- 【工业互联网产业联盟】2025年电力行业5G工厂建设实施参考指南.docx
- 半导体量检测设备二手翻新修复改造产业投融资深度分析与风险警示报告.pdf
- 中国公募基金的投资者回报差研究 202505-当幻想撞上现实.pdf
文档评论(0)