外文翻译国际建设工程风险分析
外文翻译--国际建设工程风险分析
This analysis used a case study methodology to analyse the issues surrounding the partial collapse of the roof of a building housing the headquarters of the Standards Association of Zimbabwe SAZ. In particular, it examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZ’s traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a contractor and architects in preventing and/or mitigating potential construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the plaintiff to have brought a negligence claim against both the contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction prject and risk
The structural design of the reinforced concrete elements was done by consulting engineers Knight Piesold KP. Quantity surveying services were provided by Hawkins, Leshnick Bath HLB. The contract was awarded to Central African Building Corporation CABCO who was also responsible for the provision of a specialist roof structure using patented “gang nail” roof trusses. The building construction proceeded to completion and was handed over to the owners on Sept. 12, 1991. The SAZ took effective occupation of the headquarters building without a certificate of occupation. Also, the defects liability period was only three months The roof structure was in place 10 years At first the SAZ decided to go to arbitration, but this failed to yield an immediate solution. The SAZ then decided to proceed to litigate in court and to bring a negligence claim against CABCO. The preparation for arbitration was reused
您可能关注的文档
- 公路桥梁监理公司质量手册经典完整版.doc
- 公路水运工程重大危险源管理工作方案(范本).doc
- 六安市水利发展十一五规划中期评估报告.doc
- 公司年会策划公司年会活动策划书公司年会策划模板.doc
- 关于上海世博会思想汇报.doc.doc
- 六桂福珠宝首饰集团员工制度手册人事制度表格.doc
- 关于低频数字式相位测量仪设计报告.doc
- 公司领导后备人才培养方案.doc
- 关于修订特种设备检验检测收费管理办法及收费标准.doc
- 关于农村金融服务问题的调研报告范文.doc
- 四川省绵阳市涪城区2024-2025学年九年级上学期10月化学综合练习.docx
- 云南省昆明市五华区2024-2025学年高三上学期期中考试生物试题(含答案解析).docx
- 山西省晋中市寿阳县2024-2025学年九年级上学期10月月考化学试题.docx
- 云南省昆明市2024-2025学年七年级上学期期中语文试题.docx
- 内蒙古鄂尔多斯市西四旗2024-2025学年高二上学期期中联考英语试题.docx
- 山东省部分学校2024-2025学年高一上学期10月联考语文试题.docx
- 期中模拟检测卷03综合检测(含答案解析).docx
- 云南省昆明市2024一2025学年七年级数学上学期阶段评估卷(一).docx
- 专题15 道德境界高考语文作文写作思路+必背范文.docx
- 山东省青岛市某区2024—2025学年高二上学期第一次教学质量联合监测语文试卷(含答案解析).docx
文档评论(0)