- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
GLOBAL CLAIMS - The QSi - for Quantity Surveyors全球索赔QSI -工料测量师
GLOBAL CLAIMS
BY
ROGER KNOWLES
GLOBAL CLAIMS
Background
The proper manner of presenting a claim where a legally binding decision is required is to link the cause, whether relating to delay, cost or other matter which forms the basis of the claim, with the effect. For example, if an Architect or Engineer is six weeks late in issuing to the contractor drawings for the foundations this would represent a typical cause being a breach of contract. The effect may be a six weeks delay to the completion of the works. To succeed in this claim the contractor would normally be expected to link the cause with its effect. The linking of cause and effect of delays and extra cost may not be difficult if they can be dealt with in isolation but often they arrive in significant numbers which creates a problem when trying to identify each cause and its effect. Contractors and subcontractors have overcome the problem by producing global or rolled up claims. As this type of claim does not satisfy the rule of linking cause and effect a substantial number of cases have come before the courts for a ruling.
.
Keating On Building Contracts 7th Edition at page 546 states:
Contractors often have claims dependent on a number of separate causes each of which has contributed to delay and extra cost. In principle, the loss attributable to each cause should be separately identified and particularised, but separation may be difficult.
In recent times contractors and subcontractors have been ever willing to short cut the need to link cause and effect by the use of the global claim. Where this occurs all causes of delay and extra cost are lumped together and one overall effect given as a consequence. The editors of Building Law Reports explained the global claim in the following terms in their commentary on the case of
您可能关注的文档
- 财经大学《经济法》期末模拟试卷和答案B.doc
- 译林版牛津初中英语四会单词.doc
- 语文S版小学三、四、五年级高低册百花圃中积少成多.doc
- 财经大学《经济法》期末模拟试卷和答案A.doc
- 语文小课题农村中学生作文素材积累策略研究——结题材料.doc
- 贵州版六年级上册健康教育教案..doc
- 资料苏教版六年级语文上册课文内容填空要点.doc
- 超全面!!!!高中政治_学业水平测试_复习提纲.doc
- 超几何分布与二项分布考题详解.doc
- 课件教案人教版高中数学《平面向量》全部教案.doc
- GSM网络优化的方法.doc
- GWAP网上购物系统的开发 最终稿.doc
- Henry Fielding亨利。菲尔丁简介.doc
- GSM网络优化方法研究毕业论文.doc
- Google_Android手机嵌入式系统的研_究与开发.doc
- HGZ型系列钢筋混凝土排水管骨架焊机说明书.doc
- How to Effectively Motivate Students in English Learning -英语教学论文.doc
- how to write a study plan(整理).doc
- HUMAN ANATOMY AND PHYSIOLOGY SCOPE AND SEQUENCE:人体解剖学和生理学的范围和顺序.doc
- HYD公司客户关系管理策略研究.doc
文档评论(0)