四川省水利水电建筑工程预算定额的石方工程说明(Description of the project budget quota for sichuan water conservancy and hydropower construction project) 参考.docVIP

  • 3
  • 0
  • 约8.67千字
  • 约 12页
  • 2018-02-28 发布于贵州
  • 举报

四川省水利水电建筑工程预算定额的石方工程说明(Description of the project budget quota for sichuan water conservancy and hydropower construction project) 参考.doc

四川省水利水电建筑工程预算定额的石方工程说明(Description of the project budget quota for sichuan water conservancy and hydropower construction project) 参考

四川省水利水电建筑工程预算定额的石方工程说明(Description of the project budget quota for sichuan water conservancy and hydropower construction project) The second chapter of the project budget quota for water conservancy and hydropower projects in sichuan province Said Ming 1. This chapter includes general shifang, protective layer, trench, pit excavation, horizontal hole, inclined well, vertical well, pre-splitting blasting and other stone excavation and stone residue transportation quota of 77 knots. The unit of measurement in this chapter shall be in accordance with the natural square meter. 3. Ordinary stone ex

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档