四川省水利水电建筑工程预算定额的土方工程说明(Earthwork engineering specification of budget quota for water conservancy and hydropower construction project in Sichuan) 参考.docVIP

  • 2
  • 0
  • 约7.11千字
  • 约 7页
  • 2018-02-28 发布于贵州
  • 举报

四川省水利水电建筑工程预算定额的土方工程说明(Earthwork engineering specification of budget quota for water conservancy and hydropower construction project in Sichuan) 参考.doc

四川省水利水电建筑工程预算定额的土方工程说明(Earthwork engineering specification of budget quota for water conservancy and hydropower construction project in Sichuan) 参考

四川省水利水电建筑工程预算定额的土方工程说明(Earthwork engineering specification of budget quota for water conservancy and hydropower construction project in Sichuan) Chapter 1 earthwork budget of water conservancy and hydropower construction project in Sichuan Province Explain First, this chapter includes earthwork excavation, transportation, compaction and other fixed total of 50 sections, applicable to water conservancy, electricity, construction works earthwork. Two. The unit of measurement for earthwork quotas shall be calculated in accordance with the natural law except as noted. Three. The name of earthwork

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档