精华资料成套设备出口合同范本及说明.doc

精华资料成套设备出口合同范本及说明.doc

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
精华资料成套设备出口合同范本及说明

?? Contract for Exporting Mining Equipment ? Contract No. ____ ? ? This Contract is made and entered into on the 15th,Oct. in Sulaiminiyh by and between Mass Iraq Cement Co,Ltd ( as the Buyer) and China Jiangsu Grand Economic Devolpment Co.,Ltd. a company incorporated under the laws of China(hereinafter referred to as the seller). ? Whereas, the Buyer desires to engage the Seller to provide the Mining Equipment, all related design, technical document, technical service and technical training and to obtain from the Seller a license of know-how and other technical information in relation with the Equipment’s design, erection, commissioning, operation and maintenance. Now it is hereby mutually agreed as follows: ? Article 1 Definitions ? 1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article xx. ? 1.2 “Commissioning” means the operation of the Equipment in accordance with Article 9.4 for the purpose of carrying out Performance Test. ? 1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract. ? 1.4 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 16.1. ? 1.5 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3. ? 1.6 “Erection” means the installation of the Equipment including placing and connecting parts to their positions according to the design drawing. ? 1.7 “Job Site” means the site where the Equipment shall be located and/or erected, namely Mass Iraq Cement Plant. ? 1.8 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached 100 percent of the total the Equipment price. ? 1.9 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures . ? 1.10 “Technic

文档评论(0)

almm118 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档