超前钻方案(英文版).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
超前钻方案(英文版)

C350-Construction Works for Taipa Central Section of Macao LRT Phase1 Predrilleing Work Scheme Date: Feb 27rd 2012 1. Introduction The foundation work for Taipa Central Section of Macao LRT Phase1 includes Bored Pilling PHC pile Mini steel pile According to the design requirement, predilling should be commenced before pilling and pile cap construction. There are 107 predrilling holes for site investigation. Location shows as below: 2. Investigation requirement 2.1 Distribution of the 107 predrilling holes has to follow the design plan. Show as follow table: Num. Location Holes Requirement Remarks 1 Full Viaduct 58 5m into bedrock   2 13# Station 12 5m into bedrock   3 14# Station 5 5m into bedrock   4 15# Station 5 5m into bedrock   5 16# Station 5 5m into bedrock   6 14# Footbridge 5     7 15# Footbridge 9     8 16# Footbridge 8     9 Total  107     2.2 In each pile cap position should be ahead of predrilling test. The soil sample and report should be ready for developer design the length of bored pile. 2.3 Location of each predilling hole must follow the coordinate showed in work drawings, and elevation of each hole must be recorded. 2.4 All kinds of excavated soil,gravel and rocks must be transported to the approval dumping area. 2.5 The predrilling holes layout, geology histograms and the core photo must be carried out. 3. Preparation work The preparation work is divided into technical and construction part. Technique for preparing mainly refers to the predrilling program preparation, technical quality of disclosure, predrilling quality control and project technology personnel arrangement and coordination. Construction preparation mainly comprises drilling equipment used in the apparatus, operation personnel preparation. 3.1 Technical preparation: a) Predrilling work scheme and approval b) Predrilling Measuring and positioning according to the design drawing coordinate selection TOPCON total station and GTS-602 Su Guang S3 lev

文档评论(0)

qwd513620855 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档