- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Report on TCE sensitivity assessment of offshore wind draft plan对海上风计划草案TCE敏感性评价报告.doc
Draft Plan for Offshore Wind Energy in Scottish Territorial Waters – sensitivity assessment of spatial modelling
I M Davies, C Aires
March 2011
Draft Plan for Offshore Wind Energy in Scottish Territorial Waters – sensitivity assessment of spatial modelling
Ian M Davies, Catarina Aires
Marine Scotland Science, Marine Laboratory, 375 Victoria Road, Aberdeen, AB11 8DB
Executive Summary
In May 2010, the Scottish Government published a Draft Plan for Offshore Wind Energy in Scottish Territorial Waters. The Draft Plan set out Scottish Ministers’ proposals for the development of offshore wind energy in Scottish Territorial Waters in the short, medium and long term.
The Draft Plan had initially been informed by Strategic Environmental Assessment, which allowed environmental considerations to be ‘frontloaded’ in the plan-making process. To further formulate The Draft Plan, a series of options were identified, where it initially appeared that feasibility for offshore wind energy could be explored further. Firstly, the
10 areas with Crown Estate ‘exclusivity agreements’ were viewed as a short term option. Secondly, mapping systems were used to consider where development could be technically feasible over the medium to long term. Several considerations were considered relevant at this stage – Wind Resource; Water Depth; Ports, and Grid. Thirdly, having identified the overall scope of the Draft Plan as a whole, further analysis was undertaken to identify suitable areas for development in the medium to long term. This information was used by the consultants commissioned by Scottish Government to develop the Draft Plan and the associated Strategic Environmental Assessment to map zones of broad environmental sensitivity and technical issues within the Crown Estates Marine Resource System (MaRS). The Crown Estate had operated the MaRS software, in response to instructions from the consultants. MaRS used a system of scoring and weighting information to produce graduated m
您可能关注的文档
- 中珠F1、F2、F3栋样板引路监理实施细则..doc
- 张掖中学2003年秋季学期期末考试试卷.doc
- 财政支出的结构效益分析与评价.doc
- 黄河研究生培养基地2005年.doc
- 2006级护本《内科护理学》成教试题.doc
- 我院召开2009年度工作总结.doc
- PUNJAB HERITAGE AND TOURISM PROMOTION BOARD旁遮普的文化遗产和旅游促进局.doc
- Attacks on Critical Infrastructure - OSHA HAZWOPER Training 攻击的关键基础设施- OSHA HAZWOPER培训.doc
- 2009年上半年度全市在建工程.doc
- 脑出血患者血浆及血肿引流液.doc
文档评论(0)