O B J E C T I V E S精选.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
O B J E C T I V E S精选

* Considers only development over the trainshed, not talking about developing station itself * 1989 Committee included: City, Metropolitan Toronto, TTC, Province of Ontario, GO Transit, VIA Rail, CN Rail, CP Rail, the Toronto Terminal Railways, CN Real Estate and Marathon Realty 1990 report concluded: Based on engineering solutions presented to date, overbuilding of the train shed area for commercial development should not be contemplated because of practical problems creation for station operations and expansion HOWEVER, also recognized that if engineering solutions could be sufficiently advanced in the future to address the practical problems identified, overbuilding may be a consideration Section 10.4.5 Railway Lands East Secondary Plan considers building over the trainshed provided that: Capacity and safety of train operations is not impaired Future flexibility for improvements to track system will not be reduced All environmental and development concerns associated with such development including: noise, vibration, air quality, parking, servicing, pedestrian access, and the capacity of the transportation system have been satisfactorily addressed Primary objective for the Rail Corridor and Union Station (provision of rail transportation services) will not in any way be compromised * * * * * * Option 1 – Status Quo Bay St. York St. Option 2 – Bicycle Lane Bay St. York St. Option 3 – Layby (Two Lanes) Bay St. York St. Option 4 – Layby (Four Lanes) Option 5 – Layby (Two Lanes Median) Bay St. York St. Bay St. York St. Bay St. York St. Bay St. York St. Option 6 – Median (Two Lanes) Option 7 – Median (Four Lanes) Bay St. York St. Bay St. York St. Option 8 – One Way (One Lane) Option 9 – One Way (Two Lanes) Option 10 - Closure Bay St. York St. Bay St. York St. Option 11 – Centre (Two Lanes) Option 12 – Centre (Four Lanes) Bay St. York St. Bay St. York St. Option 13 – Narrowed Road (Two Lanes) Option 14 – Narrowed Road (Four Lanes) Option 9

文档评论(0)

rovend + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档