- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
O B J E C T I V E S精选
* Considers only development over the trainshed, not talking about developing station itself * 1989 Committee included: City, Metropolitan Toronto, TTC, Province of Ontario, GO Transit, VIA Rail, CN Rail, CP Rail, the Toronto Terminal Railways, CN Real Estate and Marathon Realty 1990 report concluded: Based on engineering solutions presented to date, overbuilding of the train shed area for commercial development should not be contemplated because of practical problems creation for station operations and expansion HOWEVER, also recognized that if engineering solutions could be sufficiently advanced in the future to address the practical problems identified, overbuilding may be a consideration Section 10.4.5 Railway Lands East Secondary Plan considers building over the trainshed provided that: Capacity and safety of train operations is not impaired Future flexibility for improvements to track system will not be reduced All environmental and development concerns associated with such development including: noise, vibration, air quality, parking, servicing, pedestrian access, and the capacity of the transportation system have been satisfactorily addressed Primary objective for the Rail Corridor and Union Station (provision of rail transportation services) will not in any way be compromised * * * * * * Option 1 – Status Quo Bay St. York St. Option 2 – Bicycle Lane Bay St. York St. Option 3 – Layby (Two Lanes) Bay St. York St. Option 4 – Layby (Four Lanes) Option 5 – Layby (Two Lanes Median) Bay St. York St. Bay St. York St. Bay St. York St. Bay St. York St. Option 6 – Median (Two Lanes) Option 7 – Median (Four Lanes) Bay St. York St. Bay St. York St. Option 8 – One Way (One Lane) Option 9 – One Way (Two Lanes) Option 10 - Closure Bay St. York St. Bay St. York St. Option 11 – Centre (Two Lanes) Option 12 – Centre (Four Lanes) Bay St. York St. Bay St. York St. Option 13 – Narrowed Road (Two Lanes) Option 14 – Narrowed Road (Four Lanes) Option 9
您可能关注的文档
- Lantronix网络集中运维管理平台介绍精选.ppt
- Learning Point-3 Model Code of Conduct - District :学习行为- point-3模型代码区精选.ppt
- led灯具检测标准[整理版]详解.doc
- led照明灯具认证标准与检测精选.ppt
- LED灯具检测规范标准详解.doc
- lesson 15 soil mechanical(土木工程专业英语)精品.ppt
- lesson 1 2013土木工程英语课件课件精品.ppt
- led及灯具产品检验标准详解.doc
- lesson 15 soil mechanical(土木工程专业英语)精选.ppt
- LED点阵显示屏设计毕业论文精品.doc
- Lesson12 精通版英语六年级下册12课精选.ppt
- PEP人教版小学英语四年级下册阅读理解练习36篇详解.doc
- PEP人教版小学英语六年级上册Unit 1教案详解.doc
- PEC土木工程英语证书考试-道路勘测设计专业术语详解.doc
- pep三年级上册Unit2 Look at Me教案设计教案精品.ppt
- pep六年级上册第五单元教案ppt精品.ppt
- PDCA管理模式在消毒供应中心医院感染管理中精选.ppt
- PEP小学三年级英语口语试卷10号题精品.ppt
- OK--2013年高考英语试卷及答案---湖北卷(WORD版)精品.doc
- pep5五年级英语上册Unit6 PartA let′s learn课件精选.ppt
文档评论(0)