- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
倒大绳程序ENGLISH
ZPEB PROCEDURE FOR “HANGING OFF” BOTH THE TRAVELLING BLOCK AND VARCO TOP DRIVE SYSTEM IN THE DERRICK, THEN SLIPPING AND CUTTING THE DRILL LINE
1. SCOPE
This procedure is designed to enable the ZPEB Drilling Rig Manager to control and co-ordinate the task of slipping and cutting the drill line in a safe and proper manner with the required number of rig and wire line personnel.
2. OBJECTIVES
To have a procedure in place and to make sure all personnel involved are aware of their duties. This procedure will be discussed all personnel involved at a pre job safety meeting before the task / work starts.
3. APPLICATION
To the following ZPEB rig areas; the drill line storage drum / derrick including the Varco Top Drive System / mast / drill floor area of the drilling rig with the cooperation of the Total Drilling Program, Total Company Man.
4. RESPONSIBILITIES AND DUTIES
ZPEB Rig Manager Toolpusher will coordinate the preparation, moving and positioning of the necessary equipment to complete this task, with the full cooperation of the required numbers of ZPEB rig crew. The ZPEN Rig Manager on site, has full responsibility for all actions covering the following listed guideline instructions to slip and cut the drill line;
Confirm with the Company Man the well is stable / safe and its safe to proceed with the task of rigging up the necessary equipment for drill line slip and cut operation
All personnel involved must attend a pre job safety meeting to make sure everyone knows their duties and responsibilities. Good communications are essential by all parties involved in these drill line slip and cut operations
All parties on site to comply with Total Drilling’s relevant well design procedure and guideline information for drill line slip and cut operations. (Check and confirm all necessary wire ropes, slings, shackles, tools are prepared and ready for use for this task / operation and ANY tools required for the TDS location in the derrick can be safely tied off to pre
原创力文档


文档评论(0)