TECHNICAL BID - VOLUME III TECHNICAL SPECIFICATIONS, LIST OF技术标-第三卷技术规范,列表[精品].doc

TECHNICAL BID - VOLUME III TECHNICAL SPECIFICATIONS, LIST OF技术标-第三卷技术规范,列表[精品].doc

  1. 1、本文档共92页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
TECHNICAL BID - VOLUME III TECHNICAL SPECIFICATIONS, LIST OF技术标-第三卷技术规范,列表[精品]

TECHNICAL BID – VOLUME III TECHNICAL SPECIFICATIONS, LIST OF APPROVED MAKES MATERIALS FOR CIVIL, SANITARY, PLUMBING AND PILING WORKS OF PROPOSED (G + IV) ZONAL OFFICE BUILDING, SYNDICATE BANK. AT PREMISES NO. 651, ANANDAPUR, KOLKATA – 700 107. ISSUED BY: SYNDICATE BANK, REGIONAL OFFICE C O N S U L T A N T S : TELEPHONE I.M. ASTHANA, B.Sc., B. Arch. (Hons.) F.I.I.A. ARCHITECTS, ENGINEERS TOWN PLANNERS 2229-6833 410, QUEENS MANSION 12, PARK STREET CALCUTTA – 700 016 e-mail :- imasthana@vsnl.net SEPTEMBER, 2008 CONTENTS Technical Specifications for Civil Works Technical Specifications for Piling Works Technical Specifications for Sanitary Plumbing List of Approved Makes Materials. Technical Specifications For Civil, Sanitary Plumbing and Piling Works of Proposed (G+IV) Zonal Office Building, Syndicate Bank. At Premises No. 651, Anandapur, Kolkata – 700 107. TECHNICAL SPECIFICATIONS FOR SUPERSTRUCTURE (R.C.C.) ALLIED WORK. 1. EXCAVATION AND EARTHWORK 1.1 General The excavation will generally refer to open excavation of foundation in wet or dry conditions in all sorts of soils. All instruction/modification/approval/direction should be properly maintained in site books. Examine the Site The Contractor shall visit and ascertain the nature of the ground to be excavated and the work to be done and shall accept all responsibility for the cost of the work involved. Setting Out The Contractor shall set out the centerline of the building or other involved work after clearing the site and get the same approved from PMC/Employer. It shall be the responsibility of the Contractor to install substantial

文档评论(0)

bodkd + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档