- 1、本文档共105页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
日立汽车系统部件广州有限公司新增活塞生产线及污水处理站扩建项目建设项目环境影响报告表
建设项目环境影响报告表
项目名称:建设单位(盖章):
编制日期:201年月
国家环境保护总局制
《建设项目环境影响报告表》编制说明
《建设项目环境影响报告表》由具有从事环境影响评价工作资质的单位编制。
1. 项目名称――指项目立项批复时的名称,应不超过30个字(两个英文字段作一个汉字)。
2. 建设地点――指项目所在地详细地址,公路、铁路应填写起止地点。
3. 行业类别――按国标填写。
4. 总投资――指项目投资总额。
5. 主要环境保护目标――指项目区周围一定范围内集中居民住宅区、学校、医院、保护文物、风景名胜区、水源地和生态敏感点等,应尽可能给出保护目标、性质、规模和距厂界距离等。
6. 结论与建议――给出本项目清洁生产、达标排放和总量控制的分析结论,确定污染防治措施的有效性,说明本项目对环境造成的影响,给出建设项目环境可行性的明确结论。同时提出减少环境影响的其他建议。
7. 预审意见――由行业主管部门填写答复意见,无主管部门项目,可不填。
8. 审批意见――由负责审批该项目的环境保护行政主管部门批复。
目录1
1.1工程内容及规模·················································· 1
1.2 工程内容 ·······················································3
二、与本项目有关的原有污染情况及主要问题 ··························8
2.1 项目四至情况 ···················································8
2.2 项目原有污染情况················································10
三、建设项目所在地自然环境社会环境简况 ····························24
3.1 自然环境简况 ···················································24
3.2 社会环境简况···················································27
四、环境质量状况··················································30
4.1 环境空气质量现状···············································30
4.2 地表水环境质量现状·············································30
4.3 声环境质量现状·················································31
五、主要环境保护目标···············································32
六、评价适用标准··················································33
6.1 环境质量标准···················································33
6.2 污染物排放标准·················································33
6.3 总量控制指标···················································34
七、建设项目工程分析··············································35
7.1 工艺流程简述···················································35
7.2 施工期主要污染工序·············································37
7.3 运营期主要污染工序·············································37
八、项目主要污染物产生及预计排放情况······························48
九、主要生态影响··················································49
十、环境影响分析··················································50
10.1 施工期环境影响分析············································50
10.2 运营期环境
文档评论(0)