- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
变电所停送电操作规程[精品]
变电所停送电操作规程
This article is contributed by Hu Pengcheng 263
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Code for operation of power supply substations
First, the power supply of mine is summarized. At present, the power supply line of the middle coal industry is double circuit and 10KV line, which are taken from the 603 cabinets and 620 cabinets of different mother lines of 35KV substation in Cui Jia gou. In addition to the above the line all the power, and 800KVA generator units provided for the main fan, wells on the main winch and ground electricity and underground drainage and local ventilator for temporary use. Two, stop power operation program (1), power failure operation sequence, power failure operation, power failure operation sequence, when the line power failure, according to the following power failure operation order operation. High power procedure: first divided circuit breaker, the handle is screwed to the breaking position locking device, under isolation, isolation, and on the grounding knife, to lock the high-voltage switch power circuit breaker program: - open the isolation and car hanging atresia load power card, no isolation. After the above power failure has been completed, the power failure warning sign must be suspended, and the dispatchers office shall be informed to make a good record. The operation of power cut must strictly carry out the finger oral security confirmation method. Transmission, operation sequence (two) transmission operation sequence, power supply operation, 1 power transmission operation must be identified on the line without staff, another loop and disconnect the generator control cabinet whether power outages and the lock, after confirmation, can according to the rules of procedure of transmission. 2, when the operation of doubt, not allowed to change the operation record and operation ticket, must
Report to operator
您可能关注的文档
- 北京教师资格考试教育学笔记(打印版)[精品].doc
- 北京机动车驾驶证到期换证更换流程[精品].doc
- 北京某35kv变电站改造工程电气施工组织设计_secret[精品].doc
- 北京朝阳奥运承载区水环境治理工程顶管施工组织设计[精品].doc
- 北京某4S店供热锅炉房改造方案_SECRET[精品].doc
- 北京某办公楼施工进度计划及保障措施[精品].doc
- 北京某办公楼施工进度计划及保障措施_secret[精品].doc
- 北京某医院大楼综合布线系统电气施工组织设计_secret1[精品].doc
- 北京某医院门诊楼装修改造工程创优方案(北京建筑装饰优[精品].doc
- 北京市郑王坟再生水厂工程环境影响评价报告书[精品].doc
最近下载
- GP-150中文说明书.pdf VIP
- 中文说明书-船舶自动识别系统(AIS)FA-150版.docx VIP
- FAR21X7_28X7雷达中文操作说明书.pdf VIP
- 2025届广东深圳市物理高一第一学期期末教学质量检测试题含解析.doc VIP
- 广东高一物理第一学期期末试题.doc VIP
- 水资源及其利用——人类拥有的水资源及其分布.pdf VIP
- FURUNO古野OZS56490D_NX700使用说明书.pdf VIP
- 青岛啤酒股份有限公司成本控制存在问题及对策研究.doc
- 生物安全柜使用与维护保养记录表.doc VIP
- 输变电工程施工质量验收统一表式(变电工程电气专业).docx VIP
文档评论(0)