- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Heritage Culture Safe work instruction 安全工作指导 非洲矿业有限公司AML HSE安全管理制度 英文版
SAFE WORK INSTRUCTION
HERITAGE AND CULTURE
Document Custodian : Manager HSE Document Checked : Document Approved :
TABLE OF CONTENTS
1. distribution 2
2. SCOPE 2
3. REFERENCE 2
4. DEFINITIONS 2
5. PROCEDURE 2
5.1 Identification of Archaeological Areas 2
5.1.1 Tender Stage – Bidding for Works 2
5.1.2 Stage – Letting Contracts 2
5.1.3 Award of Contract Stage 3
5.2 Planning and Monitoring 3
5.3 New Findings 3
6. APPENDICES/FORMS 3
Nil
distribution
There are no restrictions on the distribution of this procedure within the Company.
SCOPE
This procedure details the requirements covering the following archaeological and heritage issues:
Aboriginal sacred/burial sites, relics, artefacts and Mabo style land rights claims,
Sites of archaeological significance,
Buildings and artefacts of heritage and cultural significance.
REFERENCE
Current applicable Standards.
DEFINITIONS
Nil
PROCEDURE
Identification of Archaeological Areas
Tender Stage – Bidding for Works
When developing a bid for project works, the site will be assessed by the nominated Project Manager to determine the presence of any sites or issues of archaeological or heritage significance likely to impact on the project submission. This is normally performed in conjunction with a site reconnaissance visit. It may be appropriate to engage a specialist consultant to assist with this assessment if significant archaeological or heritage issues are anticipated.
Where archaeological or heritage issues are identified, an appropriate management method shall be detailed in a site visit report, and a cost included in the tender to deal with the issues.
Stage – Letting Contracts
Prior to tendering any site contracts, the Project Manager will ensure that they are fully aware of regulatory requirements and archaeological and heritage issues pertinent to construction of the project. It may be appropriate to engage a specialist consultant to assist with this assessment to ensure that the process is thoroughly covered.
Where
您可能关注的文档
- 大润发10KV配电所设备0.4KV低压开关柜 技术规格书.doc
- 大泵后盖机加工作业指导书 XX液压有限公司ISO文件.doc
- 大正展业圆形紧固件招商手册.pdf
- 大学生心理素质与潜能开发.ppt
- 大立教育2013年二级建造师施工管理模拟试题 1~3套.doc
- 多中心 前瞻性辅助治疗导致闭经的围绝经期女性乳腺癌患者月经状态变化的临床观察性研究 CBCSG009方案介绍.ppt
- 天健 医院信息系统后台划价子系统 用户手册.doc
- 天健电子病历系统3.2培训.ppt
- 天河PCCAD制造工程图解决方案-路彦.pdf
- 大连电瓷 首次公开发行股票招股说明书.pdf
- HACH在线仪器介绍 产品详细介绍内部人员培训资料.pdf
- HD-SDI产品年中培训 高清SDI产品_2012.Q3 天地伟业办事处经理培训资料.pdf
- HiPER安全以及业务管理 艾泰科技在线认证工程师培训.pptx
- HiPER接入和基本配置 艾泰科技在线认证工程师培训.ppt
- HiPER硬件安装&常用操作_20110712 艾泰科技在线认证工程师培训.ppt
- HIS4.5药库管理业务介绍.ppt
- HiPER系统管理与状态 艾泰科技在线认证工程师培训.ppt
- HIS公司售后服务制度.doc
- Housekeeping Safe work instruction 安全工作指导 非洲矿业有限公司AML HSE安全管理制度 英文版.doc
- HIS医院管理系统方案书.ppt
文档评论(0)