- 10
- 0
- 约1.57万字
- 约 13页
- 2018-05-08 发布于河南
- 举报
HEIDENHAIN五坐标编程CHAP11
Heidenhain Conversational Programming
Drilling cycles
The TNC offers 7 cycles for all types of drilling operations.
CycleSoftkey
1 - Pecking without automatic pre-positioning.
200 - Drilling with automatic pre-positioning and
2nd setup clearance.
201 - Reaming with automatic pre-positioning and
2nd setup clearance.
202 - Boring with automatic pre-positioning and
2nd setup clearance.
203 - Universal Drilling with automatic pre-positioning,
2nd setup clearance, chip breaking and decrement.
2 - Tapping with a floating tap holder.
17 - Rigid Tapping without a floating holder.
18 - Thread C
您可能关注的文档
最近下载
- 2026年事业单位招聘考试《公共基础知识》真题库(含答案).docx
- 精密角度测量.ppt VIP
- PCSK9瑞百安作用机制介绍.pptx VIP
- 行为的动力机制.ppt VIP
- DB42/T 2133-2023 建筑施工侧埋式悬挑脚手架技术规程.pdf VIP
- 2026年北京能源集团有限责任公司校园招聘考试备考题库及答案详解.docx VIP
- 不动产登记大厅突发事件应急处置预案.docx
- BS EN 13146-9-2009+A1-2011 铁路设施.铁轨.紧固系统的试验方法.第9部分:刚度的测定.pdf VIP
- 雅思小作文写作高分课件.pptx VIP
- 人教版三年级语文上册同步练习.docx VIP
原创力文档

文档评论(0)