- 6
- 0
- 约9.91万字
- 约 60页
- 2018-05-08 发布于湖北
- 举报
石油工程专业英语- 采油技术基础(Production Technology)
Lesson 3
Production Technology
Chapters 1 and 2 discussed in some detail the equipment and procedures used in drilling and completing a well. Now let’s consider the well as part of a dynamic production system. Up to this point, describing the static geologic structure has been a basic part of the exploration and development process. Wells are drilled and logged, maps are revised, and the reservoir begins to take shape as a volume having certain dimensions. (Big ones, hopefully!) But once production begins, the reservoir is only a part of a larger system that includes the reservoir, wellbore, tubing string, artificial lift equipment, surface control devices, gathering lines, separators, treaters, tanks, and metering devices. All of these elements behave according to their own specific performance relationships, but each, in turn, also depends upon and influences the other elements. Production engineers are concerned with the interaction of these performance relationships as production occurs over time, anticipating performance changes and designing the system to maximize recovery of oil and gas economically. Understanding this dynamic production system as well as the static geologic structure is a practical objective for everyone involved in the exploration and production effort.
This chapter outlines production system equipment, starting with the completed well and moving along the flow path through the surface facilities. The same path is then retraced, but this time focusing on the dynamic flowing performance relationships that govern fluid movement through the system.
3.1 Completion Components
The basis for any completion is the heavy steel pipe lining the wellbore?the casing. Together with the cement sheath holding it in place, the casing performs several important functions:
( supporting the sides of the hole;
( preventing communication of fluids and pressures between shallow and deep formations;
( allowing for control of pressures; and
( providing a base for
您可能关注的文档
最近下载
- 2025【燕京啤酒公司发展能力存在的问题及完善对策研究4900字】.doc VIP
- AXI4Spec中文版及常见问题解答_axi协议验证常见问题.docx
- 2024年四川省绵阳市中考数学试题卷(含答案解析).docx
- 大数据技术与应用专业人才需求分析和预测性调研报告.pdf VIP
- 眼科护士护理人员三基考核试题题库与答案.docx VIP
- JT∕T 1293-2019 客运码头安全管理基本要求(可复制版).pdf
- 常用封隔器技术原理.pptx VIP
- 高教社2026人工智能经济学教学课件Ch6.人工智能与要素市场.pptx VIP
- 2025年新能源安规(光伏)试卷及答案.docx VIP
- 山区行车安全培训.pptx VIP
原创力文档

文档评论(0)