导论 运营与物流管理研究中心.ppt

  1. 1、本文档共33页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
导论 运营与物流管理研究中心

3. 考试方法: 参与(包括上课出席,发言及案例讨论、分析) 20% 作业(含作业,专著 、文献阅读) 30% 期末考试 50% 运营管理(Operations Management):导论 3. 考试方法: 参与(包括上课出席,发言及专题研究或案例讨论、分析) 20% 作业(含作业,专著、文献阅读) 30% 期末考试 50% 运营管理(Operations Management):导论 For the bread-making line, baking is the bottleneck since it has the longest cycle time. The cycle time of each bread-making line is 1 hour/100 loaves. Since there are two lines, the cycle time of bread-making is 1/2 hour/100 loaves, which is shorter than the cycle time of packaging. Thus packaging is the bottleneck of the whole process and the output capacity is 133 loaves/hour (since its cycle time is 3/4 hour/100 loaves). For the bread-making line, baking is the bottleneck since it has the longest cycle time. The cycle time of each bread-making line is 1 hour/100 loaves. Since there are two lines, the cycle time of bread-making is 1/2 hour/100 loaves, which is shorter than the cycle time of packaging. Thus packaging is the bottleneck of the whole process and the output capacity is 133 loaves/hour (since its cycle time is 3/4 hour/100 loaves). Resource Utilization Packaging machine 100% Packaging operator 40/45 = 88.9% Mixer 1/2 = 50% Oven 1/(2*0.75) = 66.7% Resource Utilization Packaging machine 100% Packaging operator 40/45 = 88.9% Mixer 1/2 = 50% Oven 1/(2*0.75) = 66.7% Assume that there is no waiting, the manufacturing lead time is just the sum of all the processing times, i.e. (3/4)*3 + 1 = 3.25 hours. The actual lead time may be higher when transportation time is significant and there is waiting due to work-in-process (WIP) inventory. The same as (1) since cooling is not the bottleneck. The same as (1) since cooling is not the bottleneck. (a) Increasing the capacity of baking would not change the overall output capacity since baking is not the bottlene

您可能关注的文档

文档评论(0)

sunshaoying + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档