安全交底(高处施工)
No.
SAFETY INSTRUCTION TRAINING RECORD FOR HIGH LOCATION JOB
ITPCL CUDDALORE PROJECT SECTION OR DEPARTMENT:
Location andWork EngineerIn charge
Name of the sub-contractor DATE ATTENDEE(signature)
Total number of Attendees : CONTENT AND REQUIREMENT NOTE: This specification is for high place job procedure, before operation shifting this document should be read familiarly by engineer and informing the labors.
ⅠGeneral Precautions
1, where the work more than two meters from the ground to ground, should be referred to high-altitude operations, should be implemented in accordance with the provisions of this Directive. Who can do the work on the ground, they have to be done on the ground to minimize the high-altitude operations.
2, as the workers in high places must be in good health, mental illness, epilepsy and physician identification with hypertension, heart disease and other illnesses should not be engaged in higher operating personnel are not allowed to participate in the high-altitude operations. Where found the staff there drinking, lack of energy prohibit aerial work.
3, higher than the operating personnel must be professional and technical training, special types of personnel must be certified. Before construction safety and technical education should be gradual and correspondent, the implementation of all safety technical measures. Workers must wear and use proper protective equipment.
4, the height required for the job security of supplies and protective equipment, signs, tools, instruments, electrical facilities, must be checked prior to the application or testing standards, it can be put into use.
5. Make the staff working at height, must be worn in good company issued before the job overalls, non-slip rubber insulated shoes, helmets and fasten your seat belt aerial work, clean up the area around the high-altitude operations and sundry items
6. When operating at high altitude, you must at least have
您可能关注的文档
最近下载
- 2050互联网与人工智能.docx VIP
- 山东劳动职业技术学院单招《数学》真题【考试直接用】附答案详解.docx VIP
- 化学-高一-第4讲-硫、氮的相关计算(一).doc VIP
- 第四章 因式分解 大单元教学设计 北师大版数学八年级下册.docx VIP
- 2026春节后复工复产应急处置方案.docx VIP
- 潍柴WP国三系列柴油机使用保养说明书.pdf VIP
- 春节后复工复产方案市政公司-春节后复工复产方案.doc VIP
- 2025年村干部考试试题及答案.docx VIP
- 《Zbrush雕刻》课件——第二章_ZBrush界面与基础操作讲解.pptx VIP
- 18G9011混凝土结构施工钢筋排布规则与构造详图(现浇混凝土框架、剪力墙、梁、板)公开版.docx VIP
原创力文档

文档评论(0)