- 1、本文档共61页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
办公楼地源热泵空调系统设计论文
毕业设计(论文)
(2012届)
题 目 常州万象办公楼地源热泵空调系统设计
学 院 石油工程学院 专业班级 建环081
万象办公楼地源热泵空调、新风及热水项目
摘要:地源热泵是利用浅层地能进行供热制冷的新型能源利用技术,是热泵的一种。地源热泵通常是指能转移地下土壤中热量或者冷量到所需要的地方。冬季地源把热量从地下土壤中转移到建筑物内,夏季再把地下的冷量转移到建筑物内。
本设计为。包含空调负荷计算,空调方案选择,以及。绘制相关图
关键词:The Wanxiang office building in Changzhou, Ground Source Heat Pump and fresh air hot water Air-conditioning System
Abstract: Ground Source Heat Pump,a kind of heat pump,is a new technology that use shallow geothermal energy for heating and cooling.It is Usually refers to shift heat or cold from the underground soil volume to where needed it.Ground Source Heat Pump also takes advantage of the capabilities that the underground soil can store thermal energy and refrigeration.In the winter,ground-source heat pump transferred to the soil from the ground to a building while it transferred the cold air to it in summer.
This design is The Wanxiang office building in Changzhou, Ground Source Heat Pump and fresh air hot water Air-conditioning System. The building covers an area of 10000 square meters. The system adopts Ground Source Heat Pump air-conditioning system, office building indoor air conditioning. The cold and heat sources adopt buried tube + cooling tower. The designs include air conditioning load calculation, air conditioning program selection, outdoor buried tube system, and indoor plumbing systems design, cooling tower hydraulic calculation, air tubes and hydraulic calculation of water and related end equipment of air-conditioning selection and calculation. The air conditioning and hot water systems designed to achieve comfortable, environmental protection, energy-saving, economic. According to various calculation results through cost-effective analysis, the selection of equipment to ensure that the equipment capacity, pressure, satisfy noise requirements. The last to draw the related design and construction drawings, complete the final design of the entire air-conditioning system.
Key Words: G
文档评论(0)