内蒙古呼伦贝尔学院工程技术学院2008级采矿工程本科毕业设计.doc

内蒙古呼伦贝尔学院工程技术学院2008级采矿工程本科毕业设计.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
内蒙古呼伦贝尔学院工程技术学院2008级采矿工程本科毕业设计.doc

摘 要矿万t/a新井设计。煤矿位于省交通便利井田南北长约,东西长约,井田总面积为2。主采煤层为号煤、号煤,平均倾角为,煤层平均总厚为m。井田地质条件较为简单井田工业储量为万t,矿井可采储量万t。矿井服务年限为a。矿井正常涌水量为m3/h,最大涌水量为m3/h。矿井为低瓦斯矿井井田划分为两水平,第一水平标高为m,第二水平标高为m,双立井开拓,主井箕斗,副井装备罐笼。大巷采用胶带运输机运煤,辅助运输采用。矿井通风方式为式通风。 矿井年工作日为3d,工作制度为制GeZhuang ore choic of 1.5 million t/a new well design. GeZhuang coal mine located in hebei tangshan choic northeast, the transportation is convenient. About 350 km long from south compartmentalized, things long about 34,000 km, with a total area of 9.0 compartmentalized km2. The Lord CaiMeiCeng for 9 coal, 12 coal, average inclination for 14 °, the average total thick coal seam for 15.93 m. Field geological conditions more simple. Field 19262 million t for industrial reserves, mine recoverable reserves 12435 million t. The design of mine production capacity of 150 million t/a, service of schooling for a 60.51 even. Mine 223.8 m3 / normal section for maximum yield h, for 570 m3 / h. The spontaneous combustion tendency to mine coal seam, coal-dust there with explosive amount addimg, relative to 3.38 m3 / t for low gas mine Field divided into two levels, the first level elevation - 375 m, second level elevation - 475 m, double actually develop a level dark portal main shaft extended by two level, skip ascension, hoist rope hoist by friction, combination steel tank way. Cage pregrouting equipment. DaHang adopts tape transporters, aided by introduced.in the narrow-gauge railway transportation with harvesters transport. Mine ventilation mode for central boundary type ventilation, using drawer-type fan. Mine years working days for 330 d, work system for 38 system, night and day, time for 16 hours net ascension. Adopted in mining face toward the longwall mining method, integrated backward type mechanized top coal caving in one full high extraction process, roof using all natural collapse mined-out area fell method processing. Daily propulsion 3.2 m, working for daily production capacity, 4425t recovery rate 84%. 目 录 0 前言 1 1 矿区概述及井田地质特征 2 1.1矿区概

您可能关注的文档

文档评论(0)

zhangningclb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档