- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业论文外文翻译-公路工程变更原因析及其对工程造价的影响
Highway engineering change reason
analysis and cost of the project of influence
Abstract: in the implementation stage because of highway engineering design factors, environmental factors, the influence of various engineering changes happened is more common, combining with engineering practice, this paper discusses the causes and engineering change of project cost.
Keywords: engineering change, Reason, Cost
Due to the highway project period, long, long line, so broad in construction of various causes by the engineering change is inevitable. Engineering change could lead to increase of construction cost or time limit of the owner and the contractor, between the claim will claim and the cost of the project.
Owner of change and the causes of the cost
And when the owner change engineering bidding of construction conditions of commitment. SanTongYiPing referred to in the preceding paragraph, the engineering tight finish, delay purpose will increase the contractors settlement fee, but little impact on total cost, the owner or project quantity change projects. Increase the project content or quantity, will increase the cost, Project content or cancel or reduce the number will reduce cost, but may affect the use function of engineering, because the owner with agreements for the existence of incomplete, or in the contract when division, can increase content of missing the contract cost, and the owners requirements, and shorten delivery of finished ahead of the original contract period, invest more in construction unit cost of manpower and material resources, to increase, and improve the design standard requirement owner, beautiful Angle from security requirements of engineering structure change type, elevation, baseline, location, size and strength, make cost increase, and the owner to change in the construction organization design has approved the construction plan, cost increase, and the owner of the contract with the owner of the materials or equipment supply for the cate
您可能关注的文档
- 毕业论文--中小企融资现状与对策分析.doc
- 毕业论文--基于单片机RFID读写器设计.doc
- 毕业论文--新课程理下初中化学课堂模式的改革.doc
- 毕业论文--无动力手式割草机设计.doc
- 毕业论文--无线网络领域安全性探索.doc
- 毕业论文-关于牌战略实施中问题及对策.doc
- 毕业论文ord编辑74问答.docx
- 毕业论文--线传感器网络.doc
- 毕业论文ord编辑步骤.doc
- 毕业论文PT制作---完美终结版.doc
- 福莱特玻璃集团股份有限公司海外监管公告 - 福莱特玻璃集团股份有限公司2024年度环境、社会及管治报告.pdf
- 广哈通信:2024年度环境、社会及治理(ESG)报告.pdf
- 招商证券股份有限公司招商证券2024年度环境、社会及管治报告.pdf
- 宏信建设发展有限公司2024 可持续发展暨环境、社会及管治(ESG)报告.pdf
- 品创控股有限公司环境、社会及管治报告 2024.pdf
- 中信建投证券股份有限公司2024可持续发展暨环境、社会及管治报告.pdf
- 洛阳栾川钼业集团股份有限公司环境、社会及管治报告.pdf
- 361度国际有限公司二零二四年环境、社会及管治报告.pdf
- 中国神华能源股份有限公司2024年度环境、社会及管治报告.pdf
- 广西能源:2024年环境、社会及治理(ESG)报告.pdf
最近下载
- 学生工作单位实习证明word模板.docx
- 横河CS3000中文培训从讲解到组态最全资料.ppt VIP
- 内容讲义文本kyn28型开关柜及五防系统.ppt
- 四年级上册美术试卷国家义务教育质量监测答案.pdf VIP
- 2024年四川省广安市《保安员证》考试题库含答案 .pdf VIP
- 毕业设计(论文)-基于PLC的电梯控制系统设计.doc
- 糖尿病护理业务学习护理课件.pptx VIP
- 三菱电梯MAXIEZ-CZ调试大纲.pdf
- 东芝2307维修手册 东芝200623062506维修手册.doc
- 中考英语阅读训练Gulliver's Travels (selection)《格列佛游记》(选段).pdf VIP
文档评论(0)