钻井工程招标文件(9章)环境管理计划.doc

钻井工程招标文件(9章)环境管理计划.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Supply and Installation of Surface and Subsurface Facilities, Water Supply and Brine Discharge Pipelines and Cavern Leaching of Tuz G?lü Underground Gas Storage Project 3 2009-01-12 Compilation of Pipeline and Storage Tender Bil Fr? Die 2 Rev 2 not issued 1 Rev 1 not issued 0 2007-03-31 Issued for Approval Kh Fr? Kre Rev. No. Date Description Prepared Checked Approved Date Approved Consortium Client Document Title: Environmental Management Plan Client: BOTAS Document-No.: DES-GENE-XX-0024-03 Rev. 3 Clients Contract No.: 7342-TU Consortium: JV DBI – TROYA Document Originator: Mr. Kalfa/Bannach/Kretzschmar Page 1/ 39 Table of Contents Index of Table 3 1.0 Mitigation Plan 4 2.0 Monitoring Plan 19 3.0 Institutional Arrangements 31 3.1 Organization Overview 31 3.2 Roles and Responsibilities 32 4.0 Annex 36 4.1 Water Pollution Control Regulation/Table 3 36 4.2 Worker’s Health and Occupational Safety Act/Article 22 36 4.3 Noise Control Regulation/Table 4,5,6 37 4.4 Decisions of Central Hunting Commission 38 4.5 Bern Convention 39 Index of Table Table 1: Mitigation Plan 4 Table 2: Monitoring Plan 19 Table 3: Domestic Wastewater Discharge Standards 36 Table 4: Maximum Noise Level that workers can subject to 37 Table 5: Noise Limit Values 37 Table 6: Noise Limit Values 38 1.0 Mitigation Plan Table 1: Mitigation Plan Phase Issue Mitigating Measure* Cost of Mitigation (If Substantial) Responsibility Start Date End Date CONSTRUCTION PIPELINE AND SURFACE FACILITIES Water Supply Brine Discharge Natural Gas Branch Line Excavation Excavation material will be re-used for trench backfilling and land restoration Backfilling will take place at the end of each day in order to ensure that there are no open trenches that pose a safety hazard during the night. The vegetative topsoil will be stored properly (by protecting with nylon covers against soil loss related to precipitation) and used for renegotiation and landscaping. Minor C

文档评论(0)

xingyuxiaxiang + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档