- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Scope of Work and Requirements for Coringand Core ProcessingTable of ContentsDiscipline Requirement- coring core Processing (on-call services)1. General2.Personnel 3.Equipment, tools and accessories 4. Optional services while coring and coring processing5.Transport6.Reporting7.Core srtorage with use of fibre / aluminuim glass inner barrelAnnexes: 1.Annex № 1 (Terms of Reference on Core Processing Services at Drilling Site) 2. Annex № 2 (Terms of Reference on Core Processing Services at Contractor Camp) 3. Annex № 3 (Preliminary scope of Core Processing )DISCIPLINE REQUIREMENT – CORING CORE PROCESSING (on-call services)1. General 1.1.Company reserves the right to order any coring and/or core processing services and will further instruct Contractor accordingly on particular necessity ofsuch services, which shall be ordered at Company’s sole discretion whenever it found essential (on-call services). 1.2. Detailed requirements on procedure, techniques, and organisational aspectsfor coring core processing services to be complied by Contractor are stipulated in Annex № 1 (Terms of Reference on Core Processing Services at Drilling Site) and Annex № 2 (Terms of Reference on Core Processing Services at Contractor Camp). Particular volume of core to be drilled, core processing specifications as well as particular scope of drilling from a certain Wells may be specified by relevant Work Order issued by Company. 1.3.Contractor shall perform coring services with focus on core quality through all phases of the service. This shall include being responsible for planning and execution, i.e. core drilling, and transportation of cores from the Drilling Site location to the designated core store with special emphasis on core handling to preserve core quality and core processing.2. Personnel2.1. Contractor shall have sufficient personnel capacity for managing and performing the service, and must be able to reorganise or possibly mobilise additional capacity for performing a reasona
您可能关注的文档
最近下载
- 高考作文模拟写作直面青春迷茫导写(附写作指导及范文点评) 2021范文.doc VIP
- 餐厅6S制作流程.pptx
- 《现代酒店服务英语》Chapter2 客房预订部服务.ppt VIP
- 北京现代领动_汽车保养手册用户服务指南车辆维护保修说明书电子版.pdf VIP
- The Beginning-钢琴谱 原调简谱 高清正版完整版双手简谱.pdf
- 高考作文模拟写作:贫困应该带给我们的 导写(附:写作指导及范文点评).docx VIP
- 光伏发电+储能项目建议书写作模板.doc VIP
- 交通安全风险评估.pdf VIP
- 隧道注浆施工记录表.doc VIP
- 《现代酒店服务英语》Chapter1 前台服务.ppt VIP
文档评论(0)