- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
压力管道试压条件确认表(Verification of pressure test conditions for pressure piping ).doc
压力管道试压条件确认表20555(Verification of pressure test conditions for pressure piping 20555)
This paper is contributed by Zhou Youxi
Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view.
SH3503SH3503J407
Inspection and pressure test of piping system installation record
Inspection content
Project Name: the name of the unit: unit name:
Examination results
The pipe component is installed correctly, valves, flange, gasket, bolt support and hanger is installed correctly installed in the correct weld weld appearance inspection work record complete nondestructive testing qualified heat treatment component marking clear safety valve, qualified alloy steel plate and blasting instrument components have been removed or separated with blind identification of pressure pipeline design of pressure welding (MPa) test pressure test medium strength (MPa) pressure tightness test (MPa) results
Design temperature (DEG)
Construction / supervision unit professional engineer: Technical Director: quality inspector: class (Group) length: Year Month Date
Shi
Working unit
Specific date
SH/T3503-J4061
Qualification of piping system withstand voltage test condition
Low pressure system of inspection items and requirements of the system.
Project Name: Yanchang Petroleum Group Xinghua energy saving and comprehensive utilization project of unit name: air separation unit (271) 1 C- low voltage examination results are consistent with the requirements to meet the requirements to meet the requirements to meet the requirements, meet the requirements to meet the requirements to meet the requirements to meet the requirements to meet the requirements to meet the requirements of
System name
Pipeline installation conforms to the design documents and specifications for pipe fittings for re inspection welding work complete records of NDT results conform to the design documents and specifications of the heat treatment results conform to
您可能关注的文档
- 会计账务处理(accounting treatment).doc
- 最新平板电视点对点情况汇总(Summary of point to point situation of latest flat panel TV).doc
- 温州育英国际实验学校初一班班主任工作计划.doc
- 《湖南农村小学师资状况调查及对策研究》课题研究报告(草稿).doc
- 下改II工作面撤除作业规程终版..doc
- 万有引力定律的成就( achievement of the law of gravity ).doc
- 大型石化企业蒸汽动力系统运营优化(Operation optimization of steam power system in large petrochemical enterprises).doc
- 南通基础教育发展状况调查报告.doc
- 新时期高校医学生心理健康教育机制构建的研究与探讨.doc
- 爱国的必备条件(Necessary conditions for patriotism).doc
- 【优秀硕士博士论文】宿州市农村学校师资状况的调查报告.doc
- 温州海洋经济发展及海洋环境保护策略论文.doc
- 平水韵平声常用韵简编(A flat water rhyme tone common rhyme).doc
- 城镇居民医疗保障体系构建及路径选择.doc
- 扁平疣药方(Flat wart prescription).doc
- 实验. 指针与数组(Experiment . pointers and arrays).doc
- 温州电力应急技能培训体系的建设与成效.doc
- 2017年留守儿童问题调查报告3篇-2017年留守儿童问题调查报告3篇-2017年留守儿童问题调查报告3篇-.doc
- 温州绿城鹿城广场项目市场研究报告及定位规划建议.doc
- 氮气管道安装施工方案(Construction scheme of nitrogen pipe installation).doc
原创力文档


文档评论(0)