压力管道试压条件确认表(Verification of pressure test conditions for pressure piping ).docVIP

压力管道试压条件确认表(Verification of pressure test conditions for pressure piping ).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
压力管道试压条件确认表(Verification of pressure test conditions for pressure piping ).doc

压力管道试压条件确认表20555(Verification of pressure test conditions for pressure piping 20555) This paper is contributed by Zhou Youxi Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. SH3503SH3503J407 Inspection and pressure test of piping system installation record Inspection content Project Name: the name of the unit: unit name: Examination results The pipe component is installed correctly, valves, flange, gasket, bolt support and hanger is installed correctly installed in the correct weld weld appearance inspection work record complete nondestructive testing qualified heat treatment component marking clear safety valve, qualified alloy steel plate and blasting instrument components have been removed or separated with blind identification of pressure pipeline design of pressure welding (MPa) test pressure test medium strength (MPa) pressure tightness test (MPa) results Design temperature (DEG) Construction / supervision unit professional engineer: Technical Director: quality inspector: class (Group) length: Year Month Date Shi Working unit Specific date SH/T3503-J4061 Qualification of piping system withstand voltage test condition Low pressure system of inspection items and requirements of the system. Project Name: Yanchang Petroleum Group Xinghua energy saving and comprehensive utilization project of unit name: air separation unit (271) 1 C- low voltage examination results are consistent with the requirements to meet the requirements to meet the requirements to meet the requirements, meet the requirements to meet the requirements to meet the requirements to meet the requirements to meet the requirements to meet the requirements of System name Pipeline installation conforms to the design documents and specifications for pipe fittings for re inspection welding work complete records of NDT results conform to the design documents and specifications of the heat treatment results conform to

您可能关注的文档

文档评论(0)

zhangningclb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档