- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
[法学]美国合法详解American Contract Law
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 2. The facts being otherwise as stated in Illustration 2 to § 152, A proposes to B during the negotiations the inclusion of a provision under which the adversely affected party can cancel the contract in the event of a material error in the surveyors report, but B refuses to agree to such a provision. The contract is not voidable by A, because A bears the risk of the mistake. 3. The facts being otherwise as stated in Illustration 6 to § 152, C is not dead but is afflicted with an incurable fatal disease and cannot live more than a year. The contract is not voidable by A, because the court will allocate to A the risk of the mistake. 4. A, an owner of land, and B, a builder, make a contract under which B is to take from As land, at a stated rate per cubic yard, all the gravel and earth necessary for the construction of a bridge, an amount estimated to be 114,000 cubic yards. A and B believe that all of the gravel and earth is above water level and can be removed by ordinary means, but in fact about one quarter of it is below water level, so that removal will require special equipment at an additional cost of about twenty percent. The contract is not voidable by B, because the court will allocate to B the risk of the mistake. Compare Illustration 5 to § 266. 5. A contracts with B to build a house on Bs land. A and B believe that subsoil conditions are normal, but in fact some of the land must be drained at an expense that will leave A no profit under the contract. The contract is not voidable by A, because the court will allocate to A the risk of the mistake. Compare Illustration 8 to § 266. 6. The facts being otherwise as stated in Illustration 1 to § 153, the $50,000 error in As bid is the result of As mistaken estimate as to the amount of labor required to do the work. A cannot avoid the contract, because the court will allocate to A the risk of
您可能关注的文档
最近下载
- 临床医学专业培养方案-延边大学医学院.DOC
- (蒙) 紫外分光测油仪校准规范.pdf VIP
- 丝蛋白创面敷料临床试验报告(主要结果) .pdf VIP
- (蒙) 血型试剂卡孵育器校准规范.pdf VIP
- (蒙) 热压罐校准规范.pdf VIP
- 六年级(上)数学晨读晚默综合每日一练.pdf VIP
- 人教版高中数学A版选必第3册《第八章 成对数据的统计分析》大单元整体教学设计.docx
- 2025医疗器械经营质量管理体系文件(全套)(可编辑!).docx VIP
- 非招标方式采购文件示范文本6.docx VIP
- 广东省茂名市高州市十二校联考2025-2026学年八年级上学期12月月考语文试题(含答案).pdf VIP
原创力文档


文档评论(0)