日产5000吨水泥熟料产线(粉磨)工艺设计_毕业设计
摘要洛阳理工学院毕业设计PAGE IV PAGE II日产5000吨水泥熟料生产线(粉磨)工艺设计—参数2摘 要本设计是针对5000t/d熟料新型干法生产线(粉磨)的工艺设计,水泥粉磨是水泥制造的最后工序,其主要功能在于将水泥熟料(及缓凝剂、性能调节材料等)粉磨至适宜的粒度(以细度、比表面积等表示),形成一定的颗粒级配,增大其水化面积,加速水化速率,满足水泥浆体凝结,硬化要求。本次设计在配料计算基础上,进行了物料平衡、储库平衡、主机平衡计算,并以此为依据,对全厂储库、主机及辅机进行了选型和工艺布置;重点对水泥粉磨进行了工艺计算、设备规格设计、工艺布置设计。采用的是目前大多数大型水泥生产线水泥粉磨系统的优选方案之一,即带辊压机的挤压联合水泥粉磨系统,最大限度的降低能耗,设计熟料烧成能耗2950kJ/kg,减少基建投资,又最大限度的提高产量、质量,做到环保,技术经济指标先进、合理。关键词:水泥厂设计, 水泥挤压联合粉磨,球磨机,辊压机5000 T/D CEMENT CLINKER PRODUCTION LINE ( GRINDING) PROCESS DESIGN-TWO PARAMETERSABSTRACTThis design is aim at the end of kiln technics for 5000t/d ripe material new type dry process calcinations workshop. Cement grinding is at the end of the cement manufacture process. Its main function is to cement clinker grinding to suitable particle. Form certain particle grading. Increase its hydration area, accelerate the hydration rate, and satisfy the Cement slurry condensation, the hardening requirements.This design carried on the material balance, reservoir balance and host balance calculation which were based on the calculation of the ingredients, and as a basis, the whole plant reservoir, main and auxiliary machinery having been selected and carried on the layout process; and then it was carried on the process calculation, equipment specification design, process layout design which were focus on the Cement grinding. Using the most current large-scale cement production line cement grinding system one of the preferred options, with a roller press to squeeze the Joint cement grinding system, it could maximum decrease the energy consumption, energy consumption for clinker design 2950kJ/kg, investment of capital construction, in the same time, it also maximum enhance the yield and quality, satisfy the requirement of protecting environment and make the technical economic index advanced and reasonable.KEY WORDS: cement clinker design, cement extrusion joint grinding, ball mill,roller press 前言目 录 TOC \o 1-3 \h \z \u HYPERLINK \l _Toc326999475 前 言 PAGEREF _Toc326
您可能关注的文档
最近下载
- 博林特电梯MPK708C调试-故障说明手册.pdf VIP
- 《锅炉》课后习题答案-西安交大版.pdf VIP
- 唐山中浩化工有限公司利用锅炉余压发电技改项目环境影响报告书(简本).doc VIP
- 二年级(下)语文1-4单元一课一练含答案.docx
- Cultural!Learning!Alliance!! (联盟文化!学习! ! !).pdf VIP
- 人教版2024~2025学年七年级上册数学核心素养全册教案.doc VIP
- 项目经理部穿透式管理实施细则.doc VIP
- 2025自动化工程师岗试题及答案.doc VIP
- DLT2617-2023 20kV配电线路带电作业技术规范.pdf VIP
- 18黄伯荣、廖序东《现代汉语》增订6版课件_第5章 语法 第八、九、十节.pptx VIP
原创力文档

文档评论(0)